project_id
532650-
SR 25/US 17 FROM CR 415/HARRY DRIGGERS BLVD TO SR 99 - PH II
Project ID:
532650-
Notice to Proceed Date:
Project Manager:
Cassius Octavius Edwards
Construction Percent Complete:
64.88%
Office:
Program Delivery
Current Completion Date:
County:
Glynn
Work Completion Date:
Congressional District:
001
Construction Contract Amount:
State Senate District.:
003
Construction Contractor:
PLANT IMPROVEMENT CO., INC.
State House District:
167
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
532650-
Project Description:
The project includes widening SR 25/US 17 from 2-lanes to 4 - 12' travel lanes (2 in each direction) with a 24' raised median & 10-foot rural outside shoulders (6.5 feet paved). The paved outside shoulders will accommodate the designated state bike route. Auxiliary turn lanes will be provided at public intersecting streets & median openings. There are 12 proposed median openings. The District 5 Traffic Engineering Study didn't support any signalization warrants. There is 1 bridge replacement to construct new bridge at Wallyleg Branch approximately MP 22.45. The widening will be to the west side of SR 25. The design speed is 55 mph. The functional classification for this project is Urban Minor Arterial. The proposed project length would be approximately 2.2 miles.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2003
$2,745,000.00
4/14/2017
PE (Preliminary Engineering)
2014
$5,000.00
4/14/2017
ROW (Right of Way)
2017
$5,560,000.00
4/19/2017
PE (Preliminary Engineering)
2017
$1,883,698.45
4/14/2017
CST (Construction)
2023
$14,534,692.77
6/10/2022
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=110140f1-b452-4b3a-8b3f-e211da14ea91&Filename=532650-_L D_JUN2017.pdf
532650-_L&D_JUN2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=110140f1-b452-4b3a-8b3f-e211da14ea91&Filename=532650-_L D_JUN2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8e7ceec5-a43c-4ed3-b0fc-c652cd57ed31&Filename=532650-_REVCR_JAN2014.pdf
532650-_REVCR_JAN2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8e7ceec5-a43c-4ed3-b0fc-c652cd57ed31&Filename=532650-_REVCR_JAN2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8fa1ba91-f555-41b2-bf8a-1ba8d6d16266&Filename=532650-_ CR_MAY2008.pdf
532650-_ CR_MAY2008.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8fa1ba91-f555-41b2-bf8a-1ba8d6d16266&Filename=532650-_ CR_MAY2008.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=9ad26bc8-9267-4f1e-bf97-8ba1628be52f&Filename=532650-_L D_Ad_JUL2017.pdf
532650-_L&D_Ad_JUL2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=9ad26bc8-9267-4f1e-bf97-8ba1628be52f&Filename=532650-_L D_Ad_JUL2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d31a86e0-4bb9-4416-9b4a-c8e025a07be1&Filename=0016985_532650-_RevCR_MAY2021.pdf
0016985_532650-_RevCR_MAY2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d31a86e0-4bb9-4416-9b4a-c8e025a07be1&Filename=0016985_532650-_RevCR_MAY2021.pdf