132610-
SR 60 FROM S OF SR 136 TO N OF CR 158/YELLOW CREEK ROAD
Project ID:
132610-
Notice to Proceed Date:
Project Manager:
Achor Njoku
Construction Percent Complete:
0.00%
Office:
Program Delivery
Current Completion Date:
County:
Hall
Work Completion Date:
Congressional District:
007, 009
Construction Contract Amount:
State Senate District.:
049
Construction Contractor:
State House District:
027
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
132610-
Project Description:
This project is the widening and reconstruction of State Route 60 from just north of the intersection of SR 136 to Yellow Creek Road in northern Hall County. The existing roadway consists of two 12 foot lanes with rural shoulders. The new roadway will be a four lane urban section with a 20' raised median. The existing culvert at Squirrel Creek will be extended to accomplish the proposed widening. Traffic will be maintained during the construction of this project. This project will enhance safety and reduce congestion along this portion of State Route 60.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
1997
$8,737,154.08
1/19/2023
PE (Preliminary Engineering)
2023
$5,739,120.32
1/19/2023
PE (Preliminary Engineering)
2030
$3,000,000.00
1/19/2023
ROW (Right of Way)
2032
$26,368,000.00
7/30/2025
UTL (Utilities)
2035
$6,250,017.38
8/30/2024
CST (Construction)
2035
$66,653,052.64
9/20/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=2fd9e3f8-988d-4e87-894a-47c32b821894&Filename=132610-_REVCR_SEP2022.pdf
132610-_REVCR_SEP2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=2fd9e3f8-988d-4e87-894a-47c32b821894&Filename=132610-_REVCR_SEP2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=654b7d6a-39ee-47bf-bc3a-47d95bb800dd&Filename=132610-_REVCR_AUG2012.pdf
132610-_REVCR_AUG2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=654b7d6a-39ee-47bf-bc3a-47d95bb800dd&Filename=132610-_REVCR_AUG2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b2a6dae5-6767-4059-a70f-84795d5b1460&Filename=132610-_CR_OCT1997.pdf
132610-_CR_OCT1997.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b2a6dae5-6767-4059-a70f-84795d5b1460&Filename=132610-_CR_OCT1997.pdf