SR 20 FROM CR 765/EAST CHEROKEE DRIVE TO SR 369
Project ID: 0014133 Notice to Proceed Date:
Project Manager: Adolfo Villarroel Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Cherokee Work Completion Date:
Congressional District: 006 Construction Contract Amount:
State Senate District.: 021 Construction Contractor:
State House District: 021, 023 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
This project proposes to widen SR 20 to six lanes (three lanes in each direction) separated by a 20-foot-wide raised median. An urban shoulder with curb and gutter and a 5-foot-wide sidewalk (or 10 foot wide shared-use path) is proposed on both sides of the outside travel lanes. Auxiliary turn lanes will be added at major driveways and intersections. Access to side roads and driveways will be controlled by Restricted Crossing U-Turns (RCUTs) placed in the median; truck turnarounds will be provided at certain RCUT locations, based on consideration of adjacent facilities that may draw tractor trailers. The proposed design speed is 45 mph. The proposed length is approximately 2.1 miles.
ActivityProgram YearCost EstimateDate of Last Estimate
ROW (Right of Way)2023$29,800,000.007/26/2022
UTL (Utilities)2025$2,009,508.605/25/2023
CST (Construction)2025$44,447,980.122/7/2024