Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0014132
SR 20 FROM CR 762/UNION HILL RD TO CR 765/EAST CHEROKEE DR
Project ID:
0014132
Notice to Proceed Date:
Project Manager:
Adolfo Villarroel
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Cherokee
Work Completion Date:
Congressional District:
006
Construction Contract Amount:
State Senate District.:
021
Construction Contractor:
State House District:
023
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0014132
Project Description:
The project will widen SR 20 to six lanes (three lanes in each direction) separated by a 20-ft raised median (see attached typical sections). There will be urban shoulders with curb and gutter and a 5-ft sidewalk on both sides of the road. A shared-used path will take the place of the sidewalk on the north side of the road from Cherokee Veterans Park to the end of the project just east of East Cherokee Drive. Auxiliary turn lanes will be added at major driveways and intersections. Access to side roads and driveways will be controlled by Restricted Crossing U-Turns (RCUTs) placed in the median; truck turnarounds are provided at certain RCUT locations based on consideration of adjacent facilities that may draw tractor trailers. The proposed length is approximately 3.9 miles.
Activity
Program Year
Cost Estimate
Date of Last Estimate
ROW (Right of Way)
2017
$1,600,000.00
3/19/2021
ROW (Right of Way)
2022
$25,580,000.00
3/19/2021
UTL (Utilities)
2026
$6,127,895.52
10/15/2023
CST (Construction)
2026
$63,219,989.93
1/22/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=3dd97cfb-11c1-4a65-b60d-8e96f51d2cdd&Filename=0014132_L D_MAY2021.pdf
0014132_L&D_MAY2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=3dd97cfb-11c1-4a65-b60d-8e96f51d2cdd&Filename=0014132_L D_MAY2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=605044ef-e59e-4fff-b6dc-0a8ed79bdc29&Filename=0014132_L D_AD_JUN2021.pdf
0014132_L&D_AD_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=605044ef-e59e-4fff-b6dc-0a8ed79bdc29&Filename=0014132_L D_AD_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a57eafff-b0ed-4a71-b160-21f2f555a141&Filename=0014132 _CR_NOV2017.pdf
0014132 _CR_NOV2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a57eafff-b0ed-4a71-b160-21f2f555a141&Filename=0014132 _CR_NOV2017.pdf