SR 306 FROM SR 400 TO SR 369
Project ID:
0013571
Notice to Proceed Date:
Project Manager:
Thaddeus M Tolbert II
Construction Percent Complete:
0.00%
Office:
Program Delivery
Current Completion Date:
County:
Forsyth
Work Completion Date:
Congressional District:
007
Construction Contract Amount:
State Senate District.:
027
Construction Contractor:
State House District:
028
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Long Range Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0013571
Project Description:
The PI 0013571 project is SR 306 from SR 400 to Parks Road in Forsyth County, GA. The typical section of the project is a 4-lane roadway divided by a 24 foot raised median with 16 foot shoulders that includes a 5 foot sidewalk. The total project length is 2.42 miles.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2018
$523,188.87
4/16/2025
PE (Preliminary Engineering)
2027
$1,294,000.00
4/16/2025
ROW (Right of Way)
2036
$6,496,000.00
5/19/2022
UTL (Utilities)
2038
$602,227.50
10/6/2021
CST (Construction)
2038
$8,559,995.99
8/5/2021
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=71c37ac2-b480-4de7-814a-d13ad6dbacbe&Filename=0013571_CR_APR2020.pdf
0013571_CR_APR2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=71c37ac2-b480-4de7-814a-d13ad6dbacbe&Filename=0013571_CR_APR2020.pdf