SR 22 @ CR 740/FULTON MILL ROAD - HRRR
Project ID: 0013332 Notice to Proceed Date:
Project Manager: Rianon Rudolfer Construction Percent Complete: 92.42%
Office: Program Delivery Current Completion Date:
County: Bibb Work Completion Date:
Congressional District: 002 Construction Contract Amount:
State Senate District.: 018, 026 Construction Contractor: REEVES CONSTRUCTION COMPANY
State House District: 142 Preconstruction Status Report
Project Type: Safety Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
A roundabout will be constructed at the intersection of SR 22/US 80/Eisenhower Parkway and Fulton Mill Road. Currently SR 22 is a four lane rural road with two lanes in each direction and a grass medium typical section. While Fulton Mill Road¿s typical section is one lane in each direction. The diameter of the proposed roundabout will be 168 ft with a single 18 ft. circulatory travel lane, a varying grass strip of 2-4 ft and a 6 ft sidewalk. The roundabout can be converted in the future when needed to two(2) circulatory travel lanes with increased traffic.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2017$727,913.38 
ROW (Right of Way)2020$370,000.008/26/2019
CST (Construction)2021$3,530,122.88 