Currently selected
Recent
project_id
0011682
I-24 @ SR 299 6 MI NE OF NEW ENGLAND
Project ID:
0011682
Notice to Proceed Date:
Project Manager:
C. Andrew Hoenig
Construction Percent Complete:
98.74%
Office:
Innovative Prog. Delivery
Current Completion Date:
County:
Dade
Work Completion Date:
Congressional District:
014
Construction Contract Amount:
State Senate District.:
053
Construction Contractor:
WRIGHT BROTHERS CONSTRUCTION COMPANY, INC.
State House District:
001
Preconstruction Status Report
Project Type:
Replacement
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
0011682
Project Description:
The proposed project will replace the existing, structurally deficient State Route (SR) 299 bridge over Interstate 24 (I-24) in Dade County, Georgia. This overpass is approximately 0.6 miles south of the Georgia/Tennessee state line at the I-24 Exit 169 interchange. The bridge will be replaced on the existing alignment using Accelerated Bridge Construction (ABC) techniques. ABC will allow the existing bridge removal and new bridge installation to occur within a time period of 36-48 hours, minimizing the project¿s impact to the traveling public. The proposed bridge will have the same number of lanes, but will be widened to meet current AASHTO requirements.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2013
$590,717.40
7/19/2012
CST (Construction)
2015
$8,571,593.57
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Project Outreach Archive
https://mydocs.dot.ga.gov/PublicOutreach/0011682/JPG/0011682%20PIOH%20Handout%20packet%2012-03-13.pdf
0011682 PIOH Handout packet 12-03-13.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0011682/JPG/0011682%20PIOH%20Handout%20packet%2012-03-13.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0011682/JPG/Construction%20Sequence%20for%20Public%202%20span.pdf
Construction Sequence for Public 2 span.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0011682/JPG/Construction%20Sequence%20for%20Public%202%20span.pdf