SR 8/SR 316/US 29 @ SR 211
Project ID: 0010352 Notice to Proceed Date:
Project Manager: Timothy B. Jennings Construction Percent Complete: 0.00%
Office: Alternative Delivery Current Completion Date:
County: Barrow Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 047 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 119 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed Project will remove the existing at-grade crossings of SR 211/Bethlehem Road and McCarty Road with US 29/SR 8/SR 316 and a create grade separated diamond interchange at SR 211/Bethlehem Road. When completed SR 211/Bethlehem Road is proposed to bridge over SR 316. McCarty Road is proposed as a cul-de-sac on the north side of SR 316 and a new local road is proposed to connect the southern portion of McCarty Road to SR 211/Bethlehem Road intersecting at Doc McLocklin Road. Additionally, north of SR 316, the Bethlehem Road and Price Street intersection will be closed, creating a dead end and cul-de-sac on Price Street. To account for this closed intersection, Statham Drive will be extended west to Price Street.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2022$1,248,480.006/28/2022
ROW (Right of Way)2023$3,190,000.0012/13/2023
PE (Preliminary Engineering)2023$1,388,144.976/28/2022
ROW (Right of Way)2024$1,120,000.0012/13/2023
CST (Construction)2024$16,110,081.034/9/2024
CST (Construction)2025$19,330,188.964/9/2024
CST (Construction)2026$16,913,915.344/9/2024
CST (Construction)2027$6,282,311.414/9/2024
CST (Construction)2028$2,879,718.074/9/2024
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports