0008690
JIMMY DELOACH PKWY EXT FM SR 21 TO SR 307
Project ID:
0008690
Notice to Proceed Date:
Project Manager:
C. Andrew Hoenig
Construction Percent Complete:
99.81%
Office:
Innovative Prog. Delivery
Current Completion Date:
County:
Chatham
Work Completion Date:
Congressional District:
001
Construction Contract Amount:
State Senate District.:
002
Construction Contractor:
THE WALSH GROUP, LTD.
State House District:
161
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0008690
Project Description:
This project is sponsored by the Georgia Ports Authority and will provide enhanced roadway connection from the Ports area to I-95. The project will begin at SR 307 Bourne Avenue and continue north along new location and connect to the existing Jimmy Deloach Parkway at SR 21. It includes the construction of several bridges including over the Norfolk Southern Railroad, CSX Railroad, Crossgate Road and wetlands.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2008
$633,514.37
2/27/2008
PE (Preliminary Engineering)
2009
$6,227,520.00
2/27/2008
UTL (Utilities)
2012
$3,771,220.12
ROW (Right of Way)
2012
$23,010,735.81
6/8/2010
CST (Construction)
2012
$78,274,311.30
8/1/2011
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Project Outreach Archive
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/Welcome%20Package%200008690.pdf
Welcome Package 0008690.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/Welcome%20Package%200008690.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/0008690-PHOH%20Handout%202011.pdf
0008690-PHOH Handout 2011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/0008690-PHOH%20Handout%202011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/Handout%202011.pdf
Handout 2011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/Handout%202011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/0008690-Handout%20package.pdf
0008690-Handout package.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/PDF/0008690-Handout%20package.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/Display%202011.pdf
Display 2011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/Display%202011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/0008690-PIOH%20Display%20Alt%202B.pdf
0008690-PIOH Display Alt 2B.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/0008690-PIOH%20Display%20Alt%202B.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/PIOH%20Display%200008690.pdf
PIOH Display 0008690.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/PIOH%20Display%200008690.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/0008690-PIOH%20Display%202011.pdf
0008690-PIOH Display 2011.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0008690/JPG/0008690-PIOH%20Display%202011.pdf