SR 8/SR 316/US 29 @ SR 53
Project ID: 0008431 Notice to Proceed Date:
Project Manager: David B. Lott Construction Percent Complete: 94.71%
Office: Program Delivery Current Completion Date:
County: Barrow Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 047 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 119 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
This project is for the grade separation of the exisiting at-grade signalized intersection of SR 316 at SR 53. The proposed grade separation will include provision for a full diamond urban interchange providing access to and from SR 316 to the cross road SR 53. The interchange will be designed to accommodate the future widening of SR 316 from existing two general-use lanes in each direction to three lanes in each direction including a barrier separated HOV lane in each direction.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2012$500,000.003/22/2017
PE (Preliminary Engineering)2017$768,838.223/22/2017
ROW (Right of Way)2018$1,049,097.273/8/2017
CST (Construction)2020$28,807,264.764/12/2019
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports

 
 
 
 
 

Project Outreach Archive