Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0008429
SR 316/US 29 @ SR 81
Project ID:
0008429
Notice to Proceed Date:
Project Manager:
David B. Lott
Construction Percent Complete:
98.89%
Office:
Program Delivery
Current Completion Date:
County:
Barrow
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
046
Construction Contractor:
CMES, INC.
State House District:
104
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0008429
Project Description:
This project is for the grade separation of the exisiting at-grade signalized intersection of SR 316 at SR 81. The proposed grade separation will include provision for a full diamond urban interchange providing access to and from SR 316 to the cross road SR 81. The interchange will be designed to accommodate the future widening of SR 316 from existing two general-use lanes in each direction to three lanes in each direction including a barrier separated HOV lane in each direction.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2012
$887,663.65
12/16/2010
ROW (Right of Way)
2016
$15,394,000.00
4/24/2015
CST (Construction)
2018
$28,332,519.61
8/17/2016
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=35b916be-242d-4730-9e2b-d99621efa94a&Filename=0008429_CR_JUN2012.pdf
0008429_CR_JUN2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=35b916be-242d-4730-9e2b-d99621efa94a&Filename=0008429_CR_JUN2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd690ddc-8f0c-42d8-aa6a-6ada9094ebbb&Filename=0008429_L D_JUN2015.pdf
0008429_L&D_JUN2015.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd690ddc-8f0c-42d8-aa6a-6ada9094ebbb&Filename=0008429_L D_JUN2015.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f9ed8535-7df0-415a-b3af-0014bc12d94c&Filename=0008429_Tearsheets_JUL2015.pdf
0008429_Tearsheets_JUL2015.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f9ed8535-7df0-415a-b3af-0014bc12d94c&Filename=0008429_Tearsheets_JUL2015.pdf