SR 136 FROM SR 136 CONN TO SR 515
Project ID: 0008314 Notice to Proceed Date:
Project Manager: Porshia Renee Hayden Construction Percent Complete: 99.92%
Office: Program Delivery Current Completion Date:
County: Pickens Work Completion Date:
Congressional District: 014 Construction Contract Amount:
State Senate District.: 051 Construction Contractor: C. W. MATTHEWS CONTRACTING CO., INC.
State House District: 011 Preconstruction Status Report
Project Type: Safety Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project includes replacing the existing tee intersection at SR 136 and SR 136 Connector with a roundabout. The intersection of SR 136 and Ellijay Road will be realigned on new location with a roundabout at the intersection. The shoulders on both sides of SR 136 throughout the project (except at the roundabouts) will be widened to a 10 ft. width with a 6.5 ft. paved width to accommodate bicyclists on a rural roadway. The intersection of SR 136 and Antioch Church Road and SR 136 at both legs of Priest Circle will be improved. SR 136/SR 515 Connector will retain four 12 ft. travel lanes and existing shoulder width.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2006$2,550,996.833/2/2017
PE (Preliminary Engineering)2017$325,000.003/2/2017
ROW (Right of Way)2018$3,230,000.0011/7/2017
CST (Construction)2020$18,094,267.748/26/2019