SR 20 FROM POST ROAD TO E OF NORTH CORNERS PKWY
Project ID: 0003682 Notice to Proceed Date:
Project Manager: David B. Lott Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Forsyth Work Completion Date:
Congressional District: 006 Construction Contract Amount:
State Senate District.: 027 Construction Contractor:
State House District: 024 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
This project proposes to widen SR 20 from west of Post Road to east of N Corners Parkway in Forsyth County. The project will widen SR 20 to six lanes (three lanes in each direction) separated by a 20 ft raised median. There will be urban shoulders with curb and gutter and a 5ft sidewalk on both sides of the road. Auxiliary turn lanes will be added at major driveways and intersections. Access to side roads and driveways will be controlled by Restricted Crossing U-Turns (RCUTs) placed in the median; truck turnarounds are provided at certain RCUT locations based on consideration of adjacent facilities that may draw tractor trailers.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2006$82,228.2512/15/2015
ROW (Right of Way)2018$8,788,537.004/10/2018
ROW (Right of Way)2019$16,180,971.004/10/2018
ROW (Right of Way)2020$16,904,745.004/10/2018
ROW (Right of Way)2021$10,000,000.004/10/2018
ROW (Right of Way)2022$9,305,747.004/10/2018
CST (Construction)2024 4/27/2023