project_id
752300-
I-285 @ CR 4519/ATLANTA ROAD
Project ID:
752300-
Notice to Proceed Date:
Project Manager:
Chandria Lynnette Brown
Construction Percent Complete:
96.02%
Office:
Program Delivery
Current Completion Date:
County:
Cobb
Work Completion Date:
Congressional District:
011
Construction Contract Amount:
State Senate District.:
006
Construction Contractor:
C. W. MATTHEWS CONTRACTING CO., INC.
State House District:
040, 053
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
752300-
Project Description:
The proposed improvements include replacing the existing twin bridges with a single, four-span bridge at approximately the same location. The spans of this bridge would be built to accommodate the future expansion of I-285, the typical section of which assumes 10 lanes of single occupancy vehicles (SOV) (5 in each direction) on the inside and 10 lanes of Collector-Distributor roads (5 in each direction) on the outside. A double left-turn bay is proposed for Atlanta Road eastbound to the I-285 northbound entrance ramp. The northbound entrance ramp would be realigned and modified from a single lane ramp to a two lane ramp to accommodate the left turns. A single left-turn bay is proposed for Atlanta Road westbound to the I-285 southbound entrance ramp. The southbound entrance ramp would be widened to allow for two lanes before merging to a single lane at the I-285 entrance gore. The I-285 southbound exit ramp would also be widened to accommodate dual left and right-turn movements.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
1997
$156,520.57
3/15/2013
ROW (Right of Way)
2012
$11,950,000.00
11/16/2011
PE (Preliminary Engineering)
2013
$35,000.00
3/15/2013
UTL (Utilities)
2014
$525,000.00
10/4/2013
CST (Construction)
2014
$42,258,230.97
10/4/2013
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/Detour_Location_Map.pdf
Detour_Location_Map.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/Detour_Location_Map.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/PDF/752300%20Complete%20Handout%20packet.pdf
752300 Complete Handout packet.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/PDF/752300%20Complete%20Handout%20packet.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/PDF/Handout.pdf
Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/PDF/Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/060525alt4_3-1-07.pdf
060525alt4_3-1-07.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/060525alt4_3-1-07.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/060525alt2_3-1-07.pdf
060525alt2_3-1-07.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/060525alt2_3-1-07.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/752300%20Concept%20DisplaywAeria.pdf
752300 Concept DisplaywAeria.pdf
http://mydocs.dot.ga.gov/PublicOutreach/752300-/JPG/752300%20Concept%20DisplaywAeria.pdf