I-75 INTERCHANGE @ CR 665/CARBONDALE ROAD; INC ROUNDABOUTS
Project ID: 610890- Notice to Proceed Date:
Project Manager: Justin Avery Banks Construction Percent Complete: 96.03%
Office: Program Delivery Current Completion Date:
County: Whitfield Work Completion Date:
Congressional District: 014 Construction Contract Amount:
State Senate District.: 054 Construction Contractor: C. W. MATTHEWS CONTRACTING CO., INC.
State House District: 004 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
This project is the reconstruction of CR 665/Carbondale Road interchange over I-75 in Whitfield County. The project will begin approximately 4000 ft north of the Lower Dug Gap Road/Norfolk Southern Railroad crossing. The project will extend eastward for approximately 5300 ft (1 mile) on new location crossing the existing Norfolk Southern Railroad with a grade separation, continuing in an easterly direction north of the Carbondale Community to the new bridge over I-75 at the current interchange location. The alignment then continues symmetrically to the existing alignment eastward to US 41/SR 3 and ends approximately 1000 ft east of the US 41/SR 3 intersection. The approved project concept consists of 2-12 ft lanes with 10 ft rural shoulders at the beginning of the project to a point approximately 3000 ft from the beginning, transitioning to 2-12 ft lanes in each direction, separated by a 20 ft raised median with 12 ft urban shoulders until approximately 200 feet east of US 41/SR 3.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1995$883,034.72 
ROW (Right of Way)2013$6,102,916.135/2/2012
PE (Preliminary Engineering)2013$523,971.25 
CST (Construction)2016$19,066,431.6711/12/2014