SR 982/TALBOTTON RD FROM 7TH AVE TO WOODRUFF RD/HILTON AVE
Project ID: 350730- Notice to Proceed Date:
Project Manager: Clinton B. Ford Construction Percent Complete: 96.36%
Office: Program Delivery Current Completion Date:
County: Muscogee Work Completion Date:
Congressional District: 002, 003 Construction Contract Amount:
State Senate District.: 015 Construction Contractor: JUNIPER HOLDINGS, INC
State House District: 140 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
Talbotton/Warm Springs Road Rd. will be widen for 1.9 miles between 7th Ave. and Woodruff Road/Hilton Ave. The typical section along Talbotton Road/Warm Springs Road from the beginning of the project northward to the intersection with 29th Street (Talbotton Road becomes Warm Springs Road at the intersection with 12th Avenue) will be two 11-foot lanes in each direction separated by a 12-foot wide flush median; from the intersection with 29th Street northward to the intersection with 35th Street will be two 12-foot lanes in each direction with no median; from 35th Street northward to the intersection with Crestview Drive will be two 11-foot lanes in each direction separated by a 12-foot wide flush median; and from Crestview Drive northward to the intersection with Woodruff Road/Hilton Avenue the typical section will be two 11-foot lanes separated by a 16-foot wide raised median. apppppapapapa
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1993$2,122,548.002/25/2015
ROW (Right of Way)1999$3,999,999.837/31/2008
ROW (Right of Way)2010$10,936,595.007/31/2008
PE (Preliminary Engineering)2015$354,244.102/25/2015
CST (Construction)2016$34,828,010.9512/4/2015