I-75 @ CR 824/JODECO ROAD - INTERCHANGE IMPROVEMENT
Project ID: 312160- Notice to Proceed Date:
Project Manager: Ernay L. Robinson Construction Percent Complete: 94.19%
Office: Program Delivery Current Completion Date:
County: Henry Work Completion Date:
Congressional District: 003 Construction Contract Amount:
State Senate District.: 010, 017 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 109, 111 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The propose project improves the interchange of I-75 (S.R. 401) at Jodeco Road (C.R. 824) in Henry County. The project proposes to widen Jodeco Road from an existing two-lane roadway to a six-lane roadway with a variable width raised median with left and right turn lanes at strategic locations. The Jodeco Road Bridge over I-75 will be replaced to accommodate the widening of the roadway. Four-foot bike lanes and 5-foot sidewalks on both sides are included along Jodeco Road with the bridge over I-75 having 6-foot sidewalks. The bike lanes and sidewalks are in accordance with the Henry County designation of Jodeco Road as a bike and pedestrian route corridor. The entrance and exit ramps would also be lengthened and widened for additional storage capacity. The project proposes to make improvements to Jodeco Road from 200 feet west of Chambers Road to 600 feet east of Meadowbrook Drive.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1999$1,517,922.14 
ROW (Right of Way)2007$1,490,000.00 
ROW (Right of Way)2009$2,000,000.00 
ROW (Right of Way)2010$14,400,871.17 
CST (Construction)2012$17,620,620.73 