Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0014073
SR 376 @ ALAPAHOOCHEE RIVER 4 MI W OF STATENVILLE
Project ID:
0014073
Notice to Proceed Date:
Project Manager:
Matthew Sanders
Construction Percent Complete:
92.38%
Office:
Program Delivery
Current Completion Date:
County:
Echols
Work Completion Date:
Congressional District:
001
Construction Contract Amount:
State Senate District.:
008
Construction Contractor:
CLEARWATER CONSTRUCTION, INC.
State House District:
174
Preconstruction Status Report
Project Type:
Replacement
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0014073
Project Description:
This project will replace the existing bridge over Alapahoochee River on SR 376 between Statenville and Lake Park with a new bridge consisting of 2 ¿ 12ft lanes, 8ft shoulders, and barrier. The existing roadway will be detoured in order to expedite the construction of the proposed bridge. The total project length is anticipated to be 1,140 feet. The proposed bridge length is estimated to be 430ft.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2017
$994,562.22
ROW (Right of Way)
2020
$120,000.00
3/10/2020
CST (Construction)
2022
$9,259,390.73
6/15/2020
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=140dde2d-f924-4a42-ba89-e3ba320b3c9c&Filename=0014073_RevCR_AUG2019.pdf
0014073_RevCR_AUG2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=140dde2d-f924-4a42-ba89-e3ba320b3c9c&Filename=0014073_RevCR_AUG2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=15c04cd9-fb80-41ea-bdb3-4ffad8f7fcc4&Filename=0014073_L D_MAY2020.pdf
0014073_L&D_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=15c04cd9-fb80-41ea-bdb3-4ffad8f7fcc4&Filename=0014073_L D_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=29539b79-daab-441d-9c62-9bc906a34a2b&Filename=0014073_L D_Ad_JUN2020.pdf
0014073_L&D_Ad_JUN2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=29539b79-daab-441d-9c62-9bc906a34a2b&Filename=0014073_L D_Ad_JUN2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=59d8ece5-0d32-478a-bd3e-d433184e578c&Filename=0014073_CR_NOV2018.pdf
0014073_CR_NOV2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=59d8ece5-0d32-478a-bd3e-d433184e578c&Filename=0014073_CR_NOV2018.pdf
Project Outreach Archive
https://mydocs.dot.ga.gov/PublicOutreach/0014073/PDF/0014073_PIOH%20Handout_Spanish_2019.3.21.pdf
0014073_PIOH Handout_Spanish_2019.3.21.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0014073/PDF/0014073_PIOH%20Handout_Spanish_2019.3.21.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0014073/PDF/0014073_PIOH%20Handout_2019.3.21.pdf
0014073_PIOH Handout_2019.3.21.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0014073/PDF/0014073_PIOH%20Handout_2019.3.21.pdf