SR 25 @ MIDDLE RIVER IN PORT WENTWORTH
Project ID: 0013742 Notice to Proceed Date:
Project Manager: Charles Trevor Brown Construction Percent Complete: 80.86%
Office: Innovative Prog. Delivery Current Completion Date:
County: Chatham Work Completion Date:
Congressional District: 001 Construction Contract Amount:
State Senate District.: 002 Construction Contractor: SCOTT BRIDGE COMPANY, INC.
State House District: 161 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The bridge on SR 25 over Middle River, Structure ID 051-0055-0, was built in 1922 and widened in 1953. The bridge consists of 69 spans of Reinforced Concrete Deck Girders (RCDG¿s) on concrete caps with concrete piles and columns. This bridge was designed using an HS-15 vehicle, which is below current design standards. The overall condition of this bridge would be classified as fair. This bridge is classified as having an unknown foundation and therefore could be at risk for scour. There are signs of differential settlement at several bent locations and estimated up to 2 inches at Bent 7. Due to the age of the structure, the structural integrity of the bridge pertaining to the design vehicle, the numerous spalls with exposed reinforcing steel throughout the structure, and the unknown foundation and differential settlement of the substructure, replacement of this 94-year old bridge is recommended.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2016$2,909,506.03 
ROW (Right of Way)2022$60,000.0012/3/2021
CST (Construction)2022$20,500,000.0010/16/2020