SR 10 LOOP EB & WB @ SR 8/US 29
Project ID: 0013716 Notice to Proceed Date:
Project Manager: Darrell Richardson Construction Percent Complete: 90.29%
Office: Program Delivery Current Completion Date:
County: Clarke Work Completion Date:
Congressional District: 009 Construction Contract Amount:
State Senate District.: 047 Construction Contractor: GEORGIA BRIDGE AND CONCRETE, LLC
State House District: 122 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The existing 298 ft.twin bridges will be replaced with 315 ft. twin bridges with two 12 ft. lanes per bridge with 12 ft. outside shoulders and 12 ft. inside shoulders. The proposed bridges will be raised approximately 3 feet to meet the minimum vertical clearance under the bridge and to accommodate concrete beams. The roadway shoulders will be widened to 12 ft. During construction the traffic will be shifted across the median to one bridge while the other is reconstructed and shifted to the previously completed bridge to complete the project. The SB US 29 Off-Ramp and the SR entrance 10 Loop from Old Hull Road will be closed to traffic and detoured approximately 0.20 miles along Athena Drive and then 0.32 miles along Old Hull Road.The proposed project is 0.67 miles in length.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2016$1,583,162.84 
CST (Construction)2021$11,472,057.038/14/2020