SR 3 @ PEACHTREE CREEK
Project ID: 0007174 Notice to Proceed Date:
Project Manager: Derrick Cameron Construction Percent Complete: 99.55%
Office: Program Delivery Current Completion Date:
County: Fulton Work Completion Date:
Congressional District: 005 Construction Contract Amount:
State Senate District.: 006, 038, 039 Construction Contractor: C. W. MATTHEWS CONTRACTING CO., INC.
State House District: 054, 055 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed roadway will consist of two 10-ft lanes, with a 10-ft two-way left turn lane & an 8-ft shoulder. The bridge section is proposed to be made of two 10-ft lanes, a 10-ft left turn lane, a 2-ft border, and a 5½-ft sidewalk on the western side of the bridge & a 5-ft border on the eastern side of the bridge. A new 15-ft wide utility/pedestrian bridge is part of this project. The utility/pedestrian bridge will be connected to a multi-use path along the eastern side of the bridge.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2007$1,013,023.369/10/2015
PE (Preliminary Engineering)2015$57,018.649/10/2015
ROW (Right of Way)2018$325,305.89 
UTL (Utilities)2019$2,643,529.73 
CST (Construction)2019$23,281,343.82 