SR 83 CONN FROM SR 11 TO SR 83
Project ID: 0000411 Notice to Proceed Date:
Project Manager: Oluchukwu Eziogonnaya Anyaebosi Construction Percent Complete: 24.58%
Office: Program Delivery Current Completion Date:
County: Walton Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 017, 046 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 112 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project is to construct a new location, 4.7-mile connector that would provide a bypass around the historic downtown City of Monroe. The connector would tie into the existing intersection of James Huff Road and SR 10/US 78. The proposed typical section along the SR 83 Connector would consist of two 12-foot lanes (one travel lane in each direction) with 10-foot outside shoulders (6.5 feet paved). At intersection locations, single 12-foot right and left-turn lanes would be provided. The existing segment of SR 83 would remain as a two-lane roadway for approximately 0.73 miles from SR 83 at SR 83 Connector and would remain as a four-lane roadway with 12-foot travel lanes with a combination of a raised and depressed median for approximately 0.48 miles leading to SR 83 at SR 10/US 78.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering) $110,000.007/19/2019
PE (Preliminary Engineering)2003$55,000.007/19/2019
PE (Preliminary Engineering)2014$50,000.007/19/2019
PE (Preliminary Engineering)2016$1,184,000.007/19/2019
PE (Preliminary Engineering)2019$590,000.007/19/2019
ROW (Right of Way)2020$11,170,000.004/25/2019
PE (Preliminary Engineering)2020$2,730,175.857/19/2019
CST (Construction)2022$29,096,939.183/4/2021