| 18 Emerging Issues: Reversible Managed Lanes | 33858 | | | 2/12/2010 3:28:13 PM | 2/12/2010 3:28:13 PM | and Disadvantages of Reversible Managed Lanes January 2010 Atlanta Regional Managed Lane System Plan Georgia Department of | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 1367 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {F87CC6F5-017A-4B81-A552-CF4EA910DFEF} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 2016SummerConstructionProjectList | 8644 | | | 5/20/2016 3:05:10 PM | 5/20/2016 3:05:10 PM | No lane closures between 6-9 am & 4-8 pm M-F and 8am-9pm Sat No lane closures 6am -8pm m-f and no lane closures between 3pm Friday -9am Monday on UGA | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/Documents/Forms/AllItems.aspx | 541 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov | {A94FED46-625D-4E16-AEFB-E55A263D9258} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Georgia Express Lanes Update | 51067 | | | 12/8/2016 5:38:07 PM | 12/8/2016 5:38:07 PM | and SR 138/ Stockbridge Highway • Two reversible Express Lanes; first in Georgia • Located in the median – lane shift to west • Variable rate tolls based | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Presentations/Forms/AllItems.aspx | 245 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {56D45D2D-50F1-4929-ACEA-C00B91B0BA91} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| I-85 PEL Study_Public Involvement Summary Phase I Report | 59514 | | | 7/14/2020 8:14:26 PM | 7/14/2020 8:14:26 PM | Public Involvement Summary Phase 1 Report PI# 0016164: I-85 from I-285 to I-985 Prepared for Georgia Department of Transportation (GDOT) and Gwinnett County Department of | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/Documents/I85 Corridor Study | 1361 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {3E1FABB4-254A-4BCC-AA3B-1B3FDE67F49E} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0004166_0000017_CST.PDF | 7538338 | | | 4/7/2014 6:51:22 PM | 4/7/2014 6:51:22 PM | Road north, the work includes converting the reversible lane to a two-way left turn lane until it connects to the existing four lane section | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans01/DesignPlansLibrary/Forms/AllItems.aspx | 1 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans01 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans01 | {7F4661C6-52CA-413F-90C4-C30D3DACA7FB} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Congestion Mitigation | 50961 | | | 2/16/2012 4:53:15 PM | 2/16/2012 4:53:15 PM | Atlanta commuters spend 57 hours per Moveable Median Moveable Median Contraflow Lane Contraflow Lane Reversible Lanes Most reversible lane options are not safe Most reversible lane | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Presentations/Forms/AllItems.aspx | 152 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {1B80E669-B606-4A64-91F3-45B61CD13717} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| DATE | 10236582 | | | 4/27/2005 1:38:26 PM | 4/27/2005 1:38:26 PM | The existing roadway consists of three lanes this project proposes to remove the reversible lane system and convert the existing center reversible lane to a two-way left turn lane | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreachTemp/0004166/PDF | 18 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {B895B730-69E4-4188-B76A-07ADA846425B} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0003406_0000041_CST.PDF | 7527342 | | | 8/30/2011 8:46:54 PM | 8/30/2011 8:46:54 PM | SR 10/US 78 FM EAST PARK This project proposes to remove the reversible lane system along US 78 in Gwinnett County work consists of removing the existing reversible lane system | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans01/DesignPlansLibrary/Forms/AllItems.aspx | 2 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans01 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans01 | {E926152A-98C8-4F94-8883-35A214141A03} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Northwest Corridor Express Lanes Update | 52254 | | | 2/15/2018 5:54:36 PM | 2/15/2018 5:54:36 PM | A Peach Pass is needed to use the Express Lanes Reversible lanes Park-and-Ride locations connect to Georgia Express Lanes and boost transit opportunities | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Board Meeting Documents/Forms/AllItems.aspx | 360 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {2C881D4A-FB2F-4330-BF40-167037DED96A} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 20 MLSP Final Report | 33860 | | | 3/11/2010 2:05:01 PM | 3/11/2010 2:05:01 PM | Trucks are not permitted in the managed lanes Managed Lane System Plan Final Report January 2010 2 Atlanta Regional Managed Lane System Plan Georgia Department of Transportation | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 1077 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {0AAACDE5-58A7-4034-84D5-DAF2E38D0A3D} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Alternative 5: BRT, Operational Improvements, and Managed Lanes | 10374599 | | | 9/19/2008 11:09:00 PM | 9/19/2008 11:09:00 PM | 3-Lane Reversible Managed Lane System (Express bus will more than likely operate in the managed lanes than likely operate in the managed lanes) At-Grade 6-Lane Managed Lane System | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreach/0001758/PDF | 35 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {13F9C188-8710-45BE-A27C-7D0CB88C0BD9} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 17 Emerging Issues: Barrier vs. Buffer | 33856 | | | 2/12/2010 3:27:28 PM | 2/12/2010 3:27:28 PM | Managed Lane System Plan of reducing capacity in the managed lanes due to friction between the quick moving managed lane and the slower moving general purpose lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 749 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {839C7A71-194A-44E7-B359-B369C9D67A3C} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Project Updates: I-285-SR400 Interchange, I75 South Metro and NWC Express Lanes | 51212 | | | 4/21/2016 4:17:15 PM | 4/21/2016 4:17:15 PM | • 30 miles of newly constructed reversible lanes • Lanes begin at Akers Mill Road and end at | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Presentations/Forms/AllItems.aspx | 264 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {B75DBC21-CCD1-4DFC-8DB9-6333C9FC9FF4} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Deal announces opening of new I-75 South Metro express lanes | 25672 | | | 1/26/2017 7:28:41 PM | 1/26/2017 7:28:41 PM | I look forward to working with The I-75 South Metro express lanes include approximately 12 miles of added capacity, with reversible lanes extending from SR 155/McDonough Road to | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 223 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {2F0107CF-DEFE-411D-AE87-FA4E5BEB02F2} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009156MAIN_SB_SR155_675_REVERSIBLE_SHAPES_04-13-2011 TYP DELETE.dgn | 10208131 | | | 4/22/2011 12:55:34 PM | 4/22/2011 12:55:34 PM | SE% 6’ PM 4:1 SE% 8’ AM MANAGED REVERSIBLE LANE 6’ SHLD PROPOSED BRIDGE INTERSTATE INTERSTATE 675 675 Reversible Managed Lanes from SR 155 to north of SR | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreachTemp/0009156/JPG | 6 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {B0D88682-91A9-4F53-BDA8-EE3008EF6A4D} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| New Water Line, Road Improvments For Northside Drive | 25919 | | | 4/7/2014 2:03:17 PM | 4/7/2014 2:03:17 PM | with this work, the existing center reversible lane from I-75 to Collier Road will be converted to a two-way left turn lane | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 141 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {BCCBCB15-646C-43F5-BA28-F55F67F64968} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Regional Project Update: Blue Ridge Projects | 51546 | | | 5/23/2016 2:35:42 PM | 5/23/2016 2:35:42 PM | SR 5 from SR 2/Blue Ridge to Other Regional Projects Northwest Corridor Express Lanes • 30 miles of newly constructed reversible lanes • Lanes begin at Akers Mill Road and end at | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Board Meeting Documents/Forms/AllItems.aspx | 302 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {9F581907-18B9-4620-96B7-52A212C5B7DE} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Creating A Managed Lanes Network In Atlanta | 20542 | | | 3/21/2013 10:51:29 PM | 3/21/2013 10:51:29 PM | usually 2 or 3] to use the lane while High-Occupancy Toll (HOT) lanes allow drivers who pay a toll to use the lane The best solution is a Managed Lanes network that utilizes PPPs | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/Viewpoint/Forms/AllItems.aspx | 177 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {A904A0D0-6634-4A78-828C-A6B7397F47BE} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009156MAIN_SB_SR155_675_REVERSIBLE_SHAPES_04-13-2011 TYP DELETE.dgn | 10208110 | | | 4/25/2011 5:43:23 PM | 4/25/2011 5:43:23 PM | REQ’D R/W LYMAN STRINGER APPROX REQ’D R/W MARTHA C. CHRISTIAN 6% L C I-75 10’ SHLD FEET 0 100 APRIL 26 & 28, 2011 3577 PARKWAY LANE, SUITE 100 NORCROSS, GA 30092 Sheet 1 of | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreachTemp/0009156/JPG | 2 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {3EF26439-3A18-4E43-ACAE-F6AAFAC25564} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| South Metro Georgia Express Lanes Reach Significant Milestone – Project Halfway Complete | 27340 | | | 2/10/2016 9:08:14 PM | 2/10/2016 9:08:14 PM | The South Metro Express Lanes will be the first of a network of reversible express lanes throughout the metro area,” said Georgia DOT About Georgia Express Lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 101 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {E48B519E-4DB2-4C92-A6CA-2826B88C3CED} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0014203 EA - Approved - 3_31_26 | 19908 | | | 4/20/2026 8:31:51 PM | 4/20/2026 8:31:51 PM | I75 mainline (Exhibit ES-1). A single auxiliary lane is also proposed to be added to the I-75 general purpose (GP) lanes to accommodate the merging trucks beginning at SR | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/systems/ProjectDocuments/0014203 | | | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/systems | {06DA3EB2-488D-4213-A2F8-CF89D6A31193} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 19 MLSP Brief Booklet | 33875 | | | 2/26/2010 4:24:55 PM | 2/26/2010 4:24:55 PM | of the purpose and intent of the managed lane system plan, the goals and objectives of managed lanes, the There are several goals and objectives associated with managed lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 452 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {750281D4-4CAE-4AEE-9D5E-92CFA4158D3A} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 122064_40_0000017_CST.PDF | 6077903 | | | 1/9/2017 6:21:46 PM | 1/9/2017 6:21:46 PM | DETAIL TWO-WAY TRAFFIC WITH A REVERSIBLE CENTER LANE TWO-WAY TRAFFIC WHERE MOTORISTS IN A SINGLE LANE ARE | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans02/Shared Documents/Forms/AllItems.aspx | 7 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans02 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans02 | {BBC7A12F-7C83-4DB2-9F54-FE1A2B01CC1B} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 222410_0001024_CST.PDF | 7247305 | | | 3/9/2017 9:09:05 PM | 3/9/2017 9:09:05 PM | MEDIAN PHYSICAL MEDIAN DIVIDED / UNDIVIDED HIGHWAY REVERSIBLE LANE NO PASSING ZONE TWO WAY LEFT TURN LANE (SEE NOTES BELOW) TYPE 3 (CLEAR/RED) 5" SOLID | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans03/DesignPlansLibrary/Forms/AllItems.aspx | 3 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans03 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans03 | {0409AEA3-96DF-4A7E-A096-20EF3A2A571C} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| I75 Southside Express Lanes Project Green Light | 25968 | | | 7/3/2013 4:44:55 PM | 7/3/2013 4:44:55 PM | north of State Route 20 and one reversible lane, also in the center median, will extend from The lanes will be barrier-separated and reversible – carrying traffic northbound in the | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 209 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {5A353598-8FDB-4764-8727-2875CD4595DA} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| ARC_TCC-TAQC | 33929 | | | 3/2/2010 5:53:27 PM | 3/2/2010 5:53:27 PM | costs, nimal costs) ons in ons in Managed Lane Sys SOV lanes can no longer address t SOV lanes can Lane Operations Ri b l L Options under con –Reversible Lanes –Bi-directional La | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 205 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {1567957B-0BCD-45B1-A90B-1B5DD513E6F0} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| MLSP 1st Meeting | 33872 | | | 3/16/2010 5:42:36 PM | 3/16/2010 5:42:36 PM | Bi-direction and reversible locations –Identifies managed –Identifies managed lane corridors would be enhanced through the implementation of implementation of reversible lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 74 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {54AFDD79-6A64-42D3-B2D2-0E1538019182} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0012832_0000060_CST.PDF | 5720328 | | | 3/9/2016 12:28:21 PM | 3/9/2016 12:28:21 PM | DETAIL TWO-WAY TRAFFIC WITH A REVERSIBLE CENTER LANE TWO-WAY TRAFFIC WHERE MOTORISTS IN A SINGLE LANE ARE | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans21/DesignPlansLibrary/Forms/AllItems.aspx | 13 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans21 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans21 | {7B471C7D-440F-4809-8617-37D7E030CF5D} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0012829_0000030_CST.PDF | 5720373 | | | 9/17/2015 5:31:53 PM | 9/17/2015 5:31:53 PM | DETAIL TWO-WAY TRAFFIC WITH A REVERSIBLE CENTER LANE TWO-WAY TRAFFIC WHERE MOTORISTS IN A SINGLE LANE ARE | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans21/DesignPlansLibrary/Forms/AllItems.aspx | 4 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans21 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans21 | {069A20C0-7CF8-497A-B332-0E3DCE222E46} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 09 Managed Lane Engineering Analysis | 33797 | | | 2/16/2010 6:06:00 PM | 2/16/2010 6:06:00 PM | Managed Lane Engineering Analysis January 2010 -vi- Atlanta Regional Managed Lane System Plan Georgia Department of Transportation . A. Geometric Considerations for Managed Lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 168 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {8CAF5E9E-576B-4A0A-A5AB-97654D895016} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Southside Atlanta I-75 Express Lane Project Highlights $288 Million In New Georgia DOT Mobility Improvements | 24544 | | | 7/8/2013 2:56:51 PM | 7/8/2013 2:56:51 PM | north of State Route 20 and one reversible lane, also in the center median, will extend from The lanes will be barrier-separated and reversible – carrying traffic northbound in the | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 84 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {DEF8F93C-89D1-4939-97BF-FB504B591E8C} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009156MAIN_SB_SR155_675_REVERSIBLE_SHAPES_04-13-2011 TYP DELETE.dgn | 10208122 | | | 4/22/2011 12:41:47 PM | 4/22/2011 12:41:47 PM | EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R/W EXISTING R | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreachTemp/0009156/JPG | 2 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {499FBD3A-B125-474A-8E27-87E591FDAE77} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 01 Emerging Issues: Survey Paper | 33859 | | | 2/16/2010 5:38:23 PM | 2/16/2010 5:38:23 PM | Houston has specifically studied access-based lane management techniques and has examined alternatives for separating managed lane traffic from traffic in general purpose lanes | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 91 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {DD1A1FBF-BB9E-4616-8370-E98C1EA721B1} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0011682_40_0000025_CST.PDF | 5714433 | | | 4/12/2018 11:47:22 AM | 4/12/2018 11:47:22 AM | DETAIL TWO-WAY TRAFFIC WITH A REVERSIBLE CENTER LANE TWO-WAY TRAFFIC WHERE MOTORISTS IN A SINGLE LANE ARE | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans21/DesignPlansLibrary/Forms/AllItems.aspx | 2 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans21 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans21 | {C5AB4714-F9A1-419D-82DC-1A2ECEDA32F2} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 16 Emerging Issues: Inside vs.Outside Managed Lanes | 33857 | | | 2/12/2010 3:26:42 PM | 2/12/2010 3:26:42 PM | Managed Lane System Plan minimize the impact to general purpose lane merging and maximize managed lanes access by placing a portion of their | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 169 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {D1DAF44B-CDAB-4F5E-8917-2B42331763F3} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Community Improvement District (CID) Meeting #1 | 33869 | | | 9/17/2013 6:54:41 PM | 9/17/2013 6:54:41 PM | New capacity managed lane strategies Lower-cost managed lane strategies (shoulder and reversible lanes during 2013-2014 Potential Managed Lane Corridors Managed Lane Corridors | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/BuildSmart/Studies/ManagedLanesDocuments/Forms/AllItems.aspx | 147 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/BuildSmart/Studies | {283AE6D9-BC3F-42C9-819B-1046016588D2} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Northwest Corridor Project | 52171 | | | 11/27/2013 3:17:25 PM | 11/27/2013 3:17:25 PM | 1 reversible barrier‐ 1 reversible barrier separated managed lane in the median of I‐575 from I‐ 75 t 6 managed lane interchanges along I 75 I‐75 | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Board Meeting Documents/Forms/AllItems.aspx | 22 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {6460034F-022A-4018-B0A0-63BE97A9BADF} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0012846_40_0000019_CST.PDF | 5720850 | | | 4/25/2017 9:02:36 PM | 4/25/2017 9:02:36 PM | DETAIL TWO-WAY TRAFFIC WITH A REVERSIBLE CENTER LANE TWO-WAY TRAFFIC WHERE MOTORISTS IN A SINGLE LANE ARE | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans21/DesignPlansLibrary/Forms/AllItems.aspx | 8 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans21 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans21 | {27695C36-F778-44A4-A956-B2464964A33C} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| RFQ-484-051121 C2 Selection Package | 6190222 | | | 11/9/2021 12:57:43 PM | 11/9/2021 12:57:43 PM | Curtis Scott, Assistant Chief Procurement Officer for Transportation Services Contract 2 – PI #0013591, Catoosa County The Office of Procurement’s Transportation Services | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/Procurement Debriefing/RFQ-484-051121 | 239 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {512D9461-E5A7-43B4-9D81-5683DE43FD38} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009157_19_0000002_CST.PDF | 7633800 | | | 7/14/2016 4:04:59 PM | 7/14/2016 4:04:59 PM | SB NB NB NB NOT TO SCALE GENERAL PURPOSE LANES LANES VARIES 1 TO 2 LANES STAGING TYPICAL SECTIONS - SINGLE AND DOUBLE MANAGED LANE SYSTEM - I-75 INNOVATIVE PROGRAM DELIVERY | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans01/DesignPlansLibrary/Forms/AllItems.aspx | 9 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans01 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans01 | {B851B3B2-B319-49D6-82DF-873705DE8077} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009157_19_0000011_CST.PDF | 7633737 | | | 7/14/2016 4:05:00 PM | 7/14/2016 4:05:00 PM | 156) & CSNHS-0009-00(157) I-75 MANAGED LANES CONSTRUCTION STAGE 1 CONSTRUCTION STAGE 2 CONSTRUCTION WIDENING AND SHOULDER FULL DEPTH LANE MANAGED SHLDR | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans01/DesignPlansLibrary/Forms/AllItems.aspx | 6 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans01 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans01 | {6CDBF7FC-E6FA-4607-9894-595696F5B828} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0009156MAIN_SB_SR155_675_REVERSIBLE_SHAPES_04-13-2011 TYP DELETE.dgn | 10208113 | | | 4/20/2011 1:18:28 PM | 4/20/2011 1:18:28 PM | WALL TS-3 TS-3 TS-4 TS-4 TS-3 TWO REVERSIBLE BARRIER SEPARATED MANAGED LANES I-75 SOUTH OF MT. CARMEL ROAD TO | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/PublicOutreachTemp/0009156/JPG | 7 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov | pdf | False | | pdf | | https://mydocs.dot.ga.gov | {70DF7384-3AE2-4F1F-91C0-830E0AB4A0CC} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Public Comments & Responses for Proposals | 31272 | | | 7/22/2013 4:06:51 PM | 7/22/2013 4:06:51 PM | and partial private financing of managed lanes from I-285 to Hickory Grove Road along I-75 offers up on the weekends would close TWO lanes at a time in the middle of the day with no | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/DriveSmart/GEL/NorthwestCorridor/Forms/AllItems.aspx | 143 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/DriveSmart/GEL | {253958BA-9D0E-4BED-971C-97A5BA5D38DB} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 0012870_40_0000016_CST.PDF | 5721319 | | | 9/12/2016 2:27:46 PM | 9/12/2016 2:27:46 PM | MEDIAN PHYSICAL MEDIAN DIVIDED / UNDIVIDED HIGHWAY REVERSIBLE LANE NO PASSING ZONE TWO WAY LEFT TURN LANE (SEE NOTES BELOW) TYPE 3 (CLEAR/RED) 5" SOLID | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans21/DesignPlansLibrary/Forms/AllItems.aspx | 4 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans21 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans21 | {F293786A-6748-4875-9070-BF90D84DF87B} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Georgia Express Lanes Project Briefing & Update | 51065 | | | 5/21/2015 3:35:33 PM | 5/21/2015 3:35:33 PM | Road and SR 138/ Stockbridge Highway • Lanes are reversible • Traffic flow will be adjusted to will take approximately three and one half years • Lanes are scheduled to open in 2018 | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/AboutGeorgia/Board/Presentations/Forms/AllItems.aspx | 130 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/AboutGeorgia/Board | {BE96FEBC-F22A-4322-A65D-02CAED11E921} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Notice of Intent | 30628 | | | 5/11/2012 3:59:32 PM | 5/11/2012 3:59:32 PM | mile Project will involve the addition of reversible managed lanes along I-75 and I575 in Cobb and The two-lane reversible facility will continue north along I-75 to the I-75/I-575 | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/DriveSmart/GEL/NorthwestCorridor/Forms/AllItems.aspx | 124 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/DriveSmart/GEL | {195A6D5A-F8DD-4C41-AA16-1A537296B72F} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Appendix F-4, Draft Section 4(f) | 19842 | | | 3/17/2026 3:02:50 PM | 3/17/2026 3:02:50 PM | 93 94 The I-75 Commercial Vehicle Lanes (CVL) project proposes the construction of two commercial 95 vehicle-only lanes in the northbound direction of I-75 | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/systems/ProjectDocuments/0014203 | | | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/systems | {A7EFD939-07F1-49D8-ACE8-6C5C74E9FFAD} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| 321530_40_0000042_CST.PDF | 6358779 | | | 2/3/2017 9:56:59 PM | 2/3/2017 9:56:59 PM | MEDIAN PHYSICAL MEDIAN DIVIDED / UNDIVIDED HIGHWAY REVERSIBLE LANE NO PASSING ZONE TWO WAY LEFT TURN LANE (SEE NOTES BELOW) TYPE 3 (CLEAR/RED) 5" SOLID | STS_ListItem_DocumentLibrary | | | https://mydocs.dot.ga.gov/info/designplans04/DesignPlansLibrary/Forms/AllItems.aspx | 6 | 0 | | | | | | 0 | https://mydocs.dot.ga.gov/info/designplans04 | pdf | False | | pdf | | https://mydocs.dot.ga.gov/info/designplans04 | {9DB35F86-404D-4114-915F-8070B14EA4DC} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| Transportation Board Advances Vital Northwest Corridor Project | 26692 | | | 9/20/2012 8:30:00 PM | 9/20/2012 8:30:00 PM | Above the I-575 interchange, one new reversible lane will be added in the I-75 center median to Hickory Grove Road and a similar new I-575 lane will extend to Sixes Road | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 40 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {A75E84E1-4A39-421A-A242-197C746877BE} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |
| STATE TRANSPORTATION BOARD | 26665 | | | 9/19/2013 7:01:40 PM | 9/19/2013 7:01:40 PM | Above the I-575 interchange, one new reversible lane will be added in the I75 center median to Hickory Grove Road and a similar new I-575 lane will extend to Sixes Road | STS_ListItem_DocumentLibrary | | | https://www.dot.ga.gov/PartnerSmart/Public/PressReleases/Forms/AllItems.aspx | 70 | 0 | | | | | | 0 | https://www.dot.ga.gov | pdf | False | | pdf | | https://www.dot.ga.gov/PartnerSmart/Public | {71B42B89-8114-4235-A1B2-627F93EF52D3} | | | ~sitecollection/_catalogs/masterpage/Display Templates/Search/Item_PDF.js | 15 | 15 |