SE ROME BYP FM SR 101 NE ON NEW LOC TO US 411; INC INTCH
Project ID: 662420- Notice to Proceed Date:
Project Manager: Galen D. Barrow Construction Percent Complete: 0.00%
Office: Program Delivery Current Completion Date:
County: Floyd Work Completion Date:
Congressional District: 014 Construction Contract Amount:
State Senate District.: 052 Construction Contractor:
State House District: 013 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
This project is on new location beginning at SR 101/Rockmart Road and ending at SR 20/US 411 at SR 1 Loop (existing East Rome Bypass). The project proposes a rural four-lane road with and a 44-ft grassed median. Bridges are being proposed to span over Callier Springs Road and an Etowah River Tributary. A roundabout is proposed at SR 20/US 411. The reconstruction of approximately 5400-ft of SR 101 is also included in this project. The length of the project is approximately 4 miles. Revised Concept Report (unapproved): 4/15/25
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1993$710,000.009/3/2024
ROW (Right of Way)2002$167,000.0011/12/2025
PE (Preliminary Engineering)2002$2,849,432.319/3/2024
ROW (Right of Way)2004$1,103,000.0011/12/2025
PE (Preliminary Engineering)2013$570,292.009/3/2024
ROW (Right of Way)2016$25,223,111.7911/12/2025
PE (Preliminary Engineering)2019$2,793,000.009/3/2024
PE (Preliminary Engineering)2020$1,000,000.009/3/2024
PE (Preliminary Engineering)2025$7,000,000.009/3/2024
PE (Preliminary Engineering)2027$4,500,000.009/3/2024
ROW (Right of Way)2028$3,000,000.0011/12/2025
UTL (Utilities)2031$25,560,080.4010/6/2025
CST (Construction)2031$135,885,981.185/2/2025