JIMMY DELOACH PARKWAY EXTENSION FM I-16 TO SR 26/US 80
Project ID: 522790- Notice to Proceed Date:
Project Manager: Christy S Lovett Construction Percent Complete: 99.52%
Office: Program Delivery Current Completion Date:
County: Chatham Work Completion Date:
Congressional District: 001 Construction Contract Amount:
State Senate District.: 001 Construction Contractor: BALFOUR BEATTY INFRASTRUCTURE, INC.
State House District: 164 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project is Phase II of Jimmy Deloach Pkwy. This project begins at the I-16/ SR17 Interchange and proceeds north along the existing SR17 to the SR17/ Pine Barren Road intersection to Jimmy DeLeoach Pkwy Phase 1 at the intersection of US80/ SR26 in Bloomingdale for a total length of 2.73 miles. Four 12-ft lanes separated by a 44-ft depressed grassed median from the I-16 to Main Street in Bloomingdale, then from Main Street to US80/ SR 26 an urban section with a 24-ft median will be utilized to minimize displacements. The existing bridge over Little Ogeechee River will be widened and a new parallel structure will be constructed to accommodate the new lanes. A new dual two lane bridge will be constructed over the CSX Railroad. Traffic will be maintained on SR17 at all times during construction.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1997$162,000.0012/28/2015
ROW (Right of Way)2014$2,204,263.215/1/2014
PE (Preliminary Engineering)2016$50,000.0012/28/2015
UTL (Utilities)2018$154,000.009/2/2016
CST (Construction)2018$26,175,512.109/2/2016