project_id
0017392
SR 11BU/SR 60 FROM CS 624/ACADEMY ST TO CS 548/GLENWOOD DR
Project ID:
0017392
Notice to Proceed Date:
Project Manager:
Quondrekka Singleton
Construction Percent Complete:
0.00%
Office:
Program Delivery
Current Completion Date:
County:
Hall
Work Completion Date:
Congressional District:
009
Construction Contract Amount:
State Senate District.:
049
Construction Contractor:
State House District:
029
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0017392
Project Description:
This project is located in the City of Gainesville, Hall County. The project begins north of the intersection of SR 11/Green Street and Academy Street, at the northern limit if the proposed roundabout to be built as part of P.I. No. 0015918. The project extends north and ends at the intersection of SR 60/Green Street NE and Glenwood Drive. This project aims to enhance safety and mobility for vehicles along the corridor while addressing the need for improved drainage and pedestrian accessibility, all while maintaining and enhancing the historic context of the corridor. The improvements on Green Street will include full-depth pavement replacement throughout much of the corridor. A 2 ft landscape/hardscape strip, 6 ft sidewalk and 2 ft utility shoulder to accommodate utilities and pedestrian lighting. The roadway¿s cross slope will be inverted toward a raised median, with the primarily drainage system running along the center of the road and within the raised median.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2021
$25,000.00
PE (Preliminary Engineering)
2022
$800,000.00
ROW (Right of Way)
2025
$9,160,000.00
6/6/2025
UTL (Utilities)
2028
$2,152,500.00
12/3/2024
CST (Construction)
2028
$14,000,000.00
12/3/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4edaf5a2-7b03-4826-8210-64007018f016&Filename=0017392_L D_AD_JUL2025.pdf
0017392_L&D_AD_JUL2025.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4edaf5a2-7b03-4826-8210-64007018f016&Filename=0017392_L D_AD_JUL2025.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd7f4ae0-d08e-40ae-b0b0-6fdf649a5629&Filename=0017392_L D_JUN2025.pdf
0017392_L&D_JUN2025.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=dd7f4ae0-d08e-40ae-b0b0-6fdf649a5629&Filename=0017392_L D_JUN2025.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=e46b5007-276b-4306-8849-28587f3563df&Filename=0017392 CR_NOV2022.pdf
0017392 CR_NOV2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=e46b5007-276b-4306-8849-28587f3563df&Filename=0017392 CR_NOV2022.pdf