SR 11/SR 22/US 129 SB & NB @ ROCK CREEK
Project ID: 0017230 Notice to Proceed Date:
Project Manager: Brandon Wallace Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Jones Work Completion Date:
Congressional District: 008 Construction Contract Amount:
State Senate District.: 025 Construction Contractor:
State House District: 133 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project would construct replacement bridges in the NBL (Structural ID 161-0001-0) and SBL (Structural ID 161-0002-0) for these existing structurally deficient bridges. The project typical are consists of two (2) ¿ 12-ft lanes with a 10-ft outside shoulder and a 6-ft inside shoulder with a design speed of 65 mph.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2022$1,648,500.00 
ROW (Right of Way)2025$500,000.005/8/2023
UTL (Utilities)2028$1,250,000.005/8/2023
CST (Construction)2028$9,706,770.845/8/2023