SR 247 @ ECHECONNEE CREEK & OVERFLOW @ 3 LOCS
Project ID: 0017221 Notice to Proceed Date:
Project Manager: Brandon Wallace Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Bibb, Houston Work Completion Date:
Congressional District: 002 Construction Contract Amount:
State Senate District.: 026 Construction Contractor:
State House District: 143, 145 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project would construct replacement bridges in the NBL for the existing structurally deficient bridges: Bridge over the Echeconnee Creek (Structure ID 153-0037-0), and Bridge over Echeconnee Creek Overflow (Structure ID 021-0056-0). For the SBL, it would construct replacement bridge for the existing structurally deficient bridge over the Echeconnee Creek Overflow (Structure ID 021-0055-0). The project typical for both NBL and SBL consists of two (2) ¿ 12-ft lanes with a 10-ft outside shoulder and a 6 ft inside shoulder with a design speed of 55 mph.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2022$2,138,000.00 
ROW (Right of Way)2026$593,000.004/15/2023
UTL (Utilities)2028$1,105,862.004/15/2023
CST (Construction)2028$17,628,471.314/15/2023