Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0016089
SR 211 FROM CS 1274/PINOT NOIR DRIVE TO SR 347
Project ID:
0016089
Notice to Proceed Date:
Project Manager:
Temitope Akinkunmi
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Barrow, Gwinnett, Hall
Work Completion Date:
Congressional District:
009, 010
Construction Contract Amount:
State Senate District.:
045, 049
Construction Contractor:
State House District:
030, 119
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0016089
Project Description:
Located entirely within the Town of Braselton, the proposed widening of SR 211 from Pinot Noir Dr to SR 347 spans Barrow, Gwinnett and Hall Counties. The proposed urban roadway section would be four 12-foot lanes divided by a raised 28-foot median with a 10-foot shared use trail on the east side. A 10-foot shared use path would be provided on the west side of the road from Thompson Mill Road to SR 347. A new four lane bridge with an 8-foot raised median would replace the existing bridge (structure ID 013-0012-0). The proposed bridge would be approximately 235 feet long and 85 feet wide and would span Duncan Creek. The length of the project on SR 211 is approximately 1.57 miles. The Liberty Church Road intersection would be reconstructed to tie into the new SR 211 widening.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2018
$200,000.00
ROW (Right of Way)
2024
$19,190,000.00
3/16/2023
CST (Construction)
2026
10/13/2025
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4919d097-a0da-437e-8578-de8f7e8ef0f4&Filename=0016089_L D_AD_JUN2021.pdf
0016089_L&D_AD_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4919d097-a0da-437e-8578-de8f7e8ef0f4&Filename=0016089_L D_AD_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a0b3e5b8-a760-4c2e-bfe6-504f7a0aa7e4&Filename=0016089_CR_MAY2020.pdf
0016089_CR_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a0b3e5b8-a760-4c2e-bfe6-504f7a0aa7e4&Filename=0016089_CR_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=e734e2f1-350c-4fd3-bd9b-00851cf7495c&Filename=0016089_L D_JUN2021.pdf
0016089_L&D_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=e734e2f1-350c-4fd3-bd9b-00851cf7495c&Filename=0016089_L D_JUN2021.pdf