project_id
0015478
SR 133 FROM 0.25 MI N OF MIKE HORNE RD TO N OF WORTH CO LINE
Project ID:
0015478
Notice to Proceed Date:
Project Manager:
Stanley Roberto Thelisma
Construction Percent Complete:
9.56%
Office:
Program Delivery
Current Completion Date:
County:
Colquitt, Worth
Work Completion Date:
Congressional District:
008
Construction Contract Amount:
State Senate District.:
011, 013
Construction Contractor:
GRIFFIN GRADING & CONCRETE, LLC
State House District:
152, 172
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0015478
Project Description:
This project begins approx. 1300 ft north of CR 187/Mike Horne Rd at MP 25.7 & continues to just north of the Colquitt/Worth County Line at MP 30.9 for a total length of 5.1 miles. The beginning of the project transitions SR 133 from a 32¿ depressed median to a 5-lane with 14¿ flush median roadway with a design speed of 45 mph. As SR 133 approaches the City of Doerun, the design speed will reduce to 35 mph & the 5-lane section will transition to a one-way pair with two lanes each direction beginning at SR 270/E Broad Ave just south of S Fain Street & transitioning back to 5-lanes with a 14¿ flush median at realigned SR 270 just north of Ticknor Rd. The 5-lane section would then transition back to a 32' depressed median to tie in to PI0000519 just north of the Colquitt/Worth County Line with the design speed increasing to 65 mph.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2018
$4,685,022.18
5/1/2019
ROW (Right of Way)
2023
$5,380,000.00
7/13/2021
CST (Construction)
2025
$44,798,637.55
6/7/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=44ed2a84-ac87-4ff4-a83c-9063e5189c0b&Filename=0015478_REVCR_APR2019.pdf
0015478_REVCR_APR2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=44ed2a84-ac87-4ff4-a83c-9063e5189c0b&Filename=0015478_REVCR_APR2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=6357a1e5-6ef7-43dc-bf4a-6f32af015911&Filename=0015478_RevCR_NOV2021.pdf
0015478_RevCR_NOV2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=6357a1e5-6ef7-43dc-bf4a-6f32af015911&Filename=0015478_RevCR_NOV2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7a188689-f1fd-417d-9e75-87200193b0ba&Filename=0015478_Affidavit_APR2022.pdf
0015478_Affidavit_APR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7a188689-f1fd-417d-9e75-87200193b0ba&Filename=0015478_Affidavit_APR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=89762a67-f0c5-4d7b-842d-d950ebebaa6e&Filename=0000520_0015478_REVCR_OCT2017.pdf
0000520_0015478_REVCR_OCT2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=89762a67-f0c5-4d7b-842d-d950ebebaa6e&Filename=0000520_0015478_REVCR_OCT2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=db1c6a5f-9f39-4cbb-8768-0390f2991897&Filename=0015478_L D_MAR2022.pdf
0015478_L&D_MAR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=db1c6a5f-9f39-4cbb-8768-0390f2991897&Filename=0015478_L D_MAR2022.pdf