SR 133 FROM 0.25 MI N OF MIKE HORNE RD TO N OF WORTH CO LINE
Project ID: 0015478 Notice to Proceed Date:
Project Manager: Stanley Roberto Thelisma Construction Percent Complete: 9.56%
Office: Program Delivery Current Completion Date:
County: Colquitt, Worth Work Completion Date:
Congressional District: 008 Construction Contract Amount:
State Senate District.: 011, 013 Construction Contractor: GRIFFIN GRADING & CONCRETE, LLC
State House District: 152, 172 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project begins approx. 1300 ft north of CR 187/Mike Horne Rd at MP 25.7 & continues to just north of the Colquitt/Worth County Line at MP 30.9 for a total length of 5.1 miles. The beginning of the project transitions SR 133 from a 32¿ depressed median to a 5-lane with 14¿ flush median roadway with a design speed of 45 mph. As SR 133 approaches the City of Doerun, the design speed will reduce to 35 mph & the 5-lane section will transition to a one-way pair with two lanes each direction beginning at SR 270/E Broad Ave just south of S Fain Street & transitioning back to 5-lanes with a 14¿ flush median at realigned SR 270 just north of Ticknor Rd. The 5-lane section would then transition back to a 32' depressed median to tie in to PI0000519 just north of the Colquitt/Worth County Line with the design speed increasing to 65 mph.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2018$4,685,022.185/1/2019
ROW (Right of Way)2023$5,380,000.007/13/2021
CST (Construction)2025$44,798,637.556/7/2024