0015090
ROCK QUARRY ROAD FROM EAGLES LANDING PKWY TO SR 42/SR 138
Project ID:
0015090
Notice to Proceed Date:
Project Manager:
Michael Vincent Hamilton
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Henry
Work Completion Date:
Congressional District:
013
Construction Contract Amount:
State Senate District.:
010
Construction Contractor:
State House District:
091, 116
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0015090
Project Description:
Rock Quarry Road project is a reconstruction project. Rock Quarry Road will be widened beginning at Eagles Landing Parkway north to SR 42/138. The total miles for the widening project is 2.60 in length. This project is located in the 13th Congressional district. Rock Quarry Road in Henry County is classified as an urban minor arterial. It is a two lane north-south facility that connects motorists from SR 42 to Eagle¿s Landing Parkway. Rock Quarry Road has intermittent turn lanes at various locations and has no continuous linear sidewalks. There are a large number of commercial and industrial businesses along the proposed project segment, as well as residential housing. This project is currently identified in the Atlanta Regional Commission's (ARC) Regional Transportation Plan (RTP), Plan 2040, and is included in the Transportation Improvement Program (TIP). This project is located within the Atlanta MPO boundary and is listed in the TIP as HE-161A.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2017
$1,500,000.00
ROW (Right of Way)
2020
$7,171,200.00
UTL (Utilities)
2025
$9,402,218.79
4/8/2024
CST (Construction)
2025
$38,144,398.67
1/31/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=bae3d670-ada5-449d-a051-800191b598ca&Filename=0015090_CR_APR2018.pdf
0015090_CR_APR2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=bae3d670-ada5-449d-a051-800191b598ca&Filename=0015090_CR_APR2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d8d60761-f318-49ac-b4d9-d77824d05fa9&Filename=0015090_L D_JUN2020.pdf
0015090_L&D_JUN2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=d8d60761-f318-49ac-b4d9-d77824d05fa9&Filename=0015090_L D_JUN2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f184728d-1646-41ee-b061-439df7aad998&Filename=0015090_L D_Ad_MAR2020 .pdf
0015090_L&D_Ad_MAR2020 .pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f184728d-1646-41ee-b061-439df7aad998&Filename=0015090_L D_Ad_MAR2020 .pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/0015090/PDF/0015090_NEPA_PIOHHandout_2017.4.13.pdf
0015090_NEPA_PIOHHandout_2017.4.13.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0015090/PDF/0015090_NEPA_PIOHHandout_2017.4.13.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0015090/PDF/24x36-Typical%20Section.pdf
24x36-Typical Section.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0015090/PDF/24x36-Typical%20Section.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0015090/JPG/35x150-Rock%20Quarry%20Rd%20Concept%20Display%20PIOH.pdf
35x150-Rock Quarry Rd Concept Display PIOH.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0015090/JPG/35x150-Rock%20Quarry%20Rd%20Concept%20Display%20PIOH.pdf