SR 42 SPUR @ NS #718064Y 0.30 MI E OF SR 54
Project ID: 0011684 Notice to Proceed Date:
Project Manager: Gretel Sims Construction Percent Complete: 99.72%
Office: Program Delivery Current Completion Date:
County: Fulton Work Completion Date:
Congressional District: 005 Construction Contract Amount:
State Senate District.: 036 Construction Contractor: GEORGIA BRIDGE AND CONCRETE, LLC
State House District: 062 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This bridge (Structure ID 121-0051-0; SR 42 Spur over Norfolk-Southern RR) was built in 1924. The bridge consists of four spans of reinforced concrete deck girders on concrete columns and concrete caps. The design vehicle used for this bridge is below the current standards. The overall condition of this bridge would be classified as poor to fair. The deck is in fair condition due to concrete cracking, spalling and the presents of efflorescence throughout. The superstructure is in poor condition with advanced concrete spalls, delamination and section loss in the reinforcing steel. One sidewalk and approximately eight feet of roadway are closed to traffic due to the section loss and spalls. The substructure is in fair condition with concrete cracking and spalls. Due to structural integrity of all components of this bridge, replacement is recommended.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2013$503,196.027/19/2012
ROW (Right of Way)2017$2,331,575.884/5/2016
CST (Construction)2018$8,284,265.904/19/2017
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports

 
 
 

Project Outreach Archive