I-20 @ SR 47 - TIA
Project ID: 0011373 Notice to Proceed Date:
Project Manager: Eric Ryan Wilkinson Construction Percent Complete: 96.39%
Office: TIA Current Completion Date:
County: Columbia Work Completion Date:
Congressional District: 010, 012 Construction Contract Amount:
State Senate District.: 023, 024 Construction Contractor: UNITED INFRASTRUCTURE GROUP INC.
State House District: 125 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The project consists of the reconstruction of the interchange on I-20 at SR 47/US 221 in Columbia County. The existing 24¿ bridge will be replaced with a 65¿-5¿ bridge with 5¿6¿ wide sidewalks and a 4¿-0¿ median. The bridge will be striped for 2 lanes but is being constructed with a sufficient width to accommodate a future 4 lane section. Roundabouts will be constructed at the ramp terminals and Nature¿s Way will be shifted to the north to increase the limited access along SR 47.
ActivityProgram YearCost EstimateDate of Last Estimate
ROW (Right of Way)2014$914,552.0912/17/2012
PE (Preliminary Engineering)2014$1,127,733.4312/17/2012
CST (Construction)2017$5,386,152.633/13/2017
CST (Construction)2020$5,344,133.043/13/2017