CR 90/COLERAIN ROAD FM W OF I-95 TO E OF KINGS BAY ROAD
Project ID: 0007414 Notice to Proceed Date:
Project Manager: Cassius Octavius Edwards Construction Percent Complete: 93.07%
Office: Program Delivery Current Completion Date:
County: Camden Work Completion Date:
Congressional District: 001 Construction Contract Amount:
State Senate District.: 3 Construction Contractor: PLANT IMPROVEMENT CO., INC.
State House District: 180 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Complete More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed Colerain Road/ CR 90 typical section is two 12-foot lanes in each direction separated by a 20-foot raised median. The purpose of this Revised Concept Report is to change the urban shoulder section from 4-foot bike lanes and 5-foot sidewalks on both sides to a 10-foot multi-use path on the north side and a 5-foot sidewalk on the soufu side of proposed Colerain Road as a cost savings measure while meeting Camden County's bike route system requirements for Colerain Road. The rural shoulder section from 2664 feet west of I-95 to relocated Brazell Road is changed to an urban section to eliminate the need for barrier separation between the travel lanes and the multi-use path on the proposed bridge over I-95. The rural shoulder section from 3800 feet west of Wmding Road to Winding Road is changed to an urban section. The substantial residential development planned for this area would use the sidewalks to the nearby county high school. The rural shoulder section from Wmd
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2007$1,162,324.673/27/2014
ROW (Right of Way)2013$6,530,000.005/1/2013
PE (Preliminary Engineering)2015$50,000.003/27/2014
CST (Construction)2017$47,576,129.5912/2/2015