SR 180 @ SLAUGHTER CREEK
Project ID: 0007055 Notice to Proceed Date:
Project Manager: Sumit Gevaria Construction Percent Complete: 41.64%
Office: Program Delivery Current Completion Date:
County: Union Work Completion Date:
Congressional District: 009 Construction Contract Amount:
State Senate District.: 051 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 008 Preconstruction Status Report
Project Type: Replacement Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The purpose of this project is to replace the existing bridge on SR 180 over Slaughter Creek at Lake Winfield Scott in Union County, 9.5 miles south of Blairsville. The existing bridge was constructed in 1914. Stage construction will be used during construction reducing the bridge to a one lane signalized roadway for local traffic and peds/bikes. An off-site detour will be used during construction of the bridge for large vehicles. The proposed bridge will be 100 foot long by 38.5 feet wide consisting of a 2-13 foot travel lanes (shared use for bicycles) a 4 foot flush shoulder SB and a 6 foot sidewalk NB (along the Lake Winfield Scott side).
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2014$1,358,190.005/27/2021
PE (Preliminary Engineering)2021$600,000.005/27/2021
CST (Construction)2024$4,027,439.4212/1/2023
Project Search (TransPI) Map