Welcome to The GDOT
Currently selected
Recent
project_id
522460-
SR 67 FM I-16 TO STATESBORO BYPASS
Project ID:
522460-
Notice to Proceed Date:
Project Manager:
Brent Blocker
Construction Percent Complete:
79.89%
Office:
Program Delivery
Current Completion Date:
County:
Bulloch
Work Completion Date:
Congressional District:
012
Construction Contract Amount:
State Senate District.:
004
Construction Contractor:
REEVES CONSTRUCTION COMPANY
State House District:
160
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
522460-
Project Description:
Project ST00-0149(030) begins approximately 0.4 miles south of I-16 and extends north to a point south of CR 585 (Burkhalter Road), tying into project STP-149-1(29). The existing 2 lane roadway will be reconstructed to a 4 lane roadway with a 32' divided depressed median (normal) then transition to a 14ft two way left turn lane approximately 200 feet south of CR 585 and continue to the end of the project. The project includes reconstruction of the I-16 ramp intersections and some relocation of the WB Exit ramp. Project Length is approximately 10.86) Typical sections will include 6.5 foot paved shoulders in the rural sections and 4 foot bike lanes will be utilized in the curb and gutter sections of the project. There will be four 5 lane sections consisting of 12 outside lanes, 11 ft. inside lanes, and a 14 ft. flush median. The design speed will be 45 and 55 mph.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2002
$1,999,973.78
ROW (Right of Way)
2016
$8,250,000.00
12/4/2015
PE (Preliminary Engineering)
2016
$250,000.00
CST (Construction)
2019
$51,585,689.80
9/19/2016
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=35a17d9a-eb09-4a12-aa12-fba51fd00b0e&Filename=522460-_RevCR_OCT2012.pdf
522460-_RevCR_OCT2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=35a17d9a-eb09-4a12-aa12-fba51fd00b0e&Filename=522460-_RevCR_OCT2012.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a041fe5e-46d8-4cc8-8859-e833a39da796&Filename=522460_L D_NOV2016.pdf
522460_L&D_NOV2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=a041fe5e-46d8-4cc8-8859-e833a39da796&Filename=522460_L D_NOV2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b58b1396-308e-4be7-913b-16adf98c487e&Filename=522460_L D_AD_DEC2016.pdf
522460_L&D_AD_DEC2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b58b1396-308e-4be7-913b-16adf98c487e&Filename=522460_L D_AD_DEC2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=cc0b270b-b7c6-4f87-bcad-10c8b05e165b&Filename=522460-_522465-_CR_MAR1993.pdf
522460-_522465-_CR_MAR1993.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=cc0b270b-b7c6-4f87-bcad-10c8b05e165b&Filename=522460-_522465-_CR_MAR1993.pdf