SR 26 FROM I-516 TO CS 188/OGEECHEE ROAD
Project ID: 521855- Notice to Proceed Date:
Project Manager: Samuel Xzavier Williams Construction Percent Complete: 47.52%
Office: Program Delivery Current Completion Date:
County: Chatham Work Completion Date:
Congressional District: 001 Construction Contract Amount:
State Senate District.: 002 Construction Contractor: ASTRA GROUP LLC
State House District: 162, 163 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
This project consists of the he proposed widening of SR 26/US 80/Ogeechee Road from just east of Lynes Parkway to just east of the Springfield Canal and the SR 26/US 80/Ogeechee Road Intersection with Victory Drive. Approximately 1400 feet of Victory Drive would also be reconstructed to tie the proposed widening of SR 26/US 80/Ogeechee Road into the existing Victory Drive roadway. The total length of the project would be a distance of 1.65 miles. The existing two-lane roadway would be widened to provide one twelve and one eleven foot lane in each direction, with two four-foot wide bicycle lanes, one in each direction, and a sixteen-foot wide raised median. The existing bridge over CSX railroad will be replaced. A culvert will replace the existig culvert at the Springfield canal.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)1993$790,000.003/27/2014
PE (Preliminary Engineering)2003$1,000,000.003/27/2014
PE (Preliminary Engineering)2016$824,402.593/27/2014
ROW (Right of Way)2017$6,339,000.00 
PE (Preliminary Engineering)2017$330,000.003/27/2014
PE (Preliminary Engineering)2018$1,290,000.003/27/2014
ROW (Right of Way)2019$8,691,000.00 
CST (Construction)2023$70,092,080.486/10/2022
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports