project_id
311400-
I-75 FROM I-16 TO CR 478/PIERCE AVE - PHASE VI
Project ID:
311400-
Notice to Proceed Date:
Project Manager:
Frank Childs Jr
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Bibb
Work Completion Date:
Congressional District:
002, 008
Construction Contract Amount:
State Senate District.:
025, 026
Construction Contractor:
State House District:
142, 143
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
311400-
Project Description:
I-75 FROM I-16 TO Red Oak Drive - PHASE VI - Phase 6 will complete the construction of the I-75 corridor to the north of the I-16 / I-75 interchange and will connect with construction that has been completed on I-75 under PI 312090. Phase 6 consists of 1.47 miles of capacity improvements to I-75 Northbound and Southbound from the I-16 Interchange to Pierce Ave. (milepost 165.22 to 166.70) which includes a 1575' long bridge that will be constructed over the Norfolk Southern Railroad. Phase 6 also includes 1.54 miles of milling and overlay for new striping and signage (milepost 166.70 to 168.24) for construction that was completed as part of PI 312090 for a total project length of 3.016 miles.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
1992
$5,205,312.91
ROW (Right of Way)
2011
$22,201.50
UTL (Utilities)
2026
$4,102,482.00
4/19/2024
CST (Construction)
2026
$119,513,333.63
8/21/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=3dc93ac0-25ec-4333-a063-f60f13028e3a&Filename=311400-_L D_ADVERT_OCT2010.pdf
311400-_L&D_ADVERT_OCT2010.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=3dc93ac0-25ec-4333-a063-f60f13028e3a&Filename=311400-_L D_ADVERT_OCT2010.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=97fb65b9-22d7-4a31-80db-c31111a0be46&Filename=311400-_REVCR_SEP2010.pdf
311400-_REVCR_SEP2010.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=97fb65b9-22d7-4a31-80db-c31111a0be46&Filename=311400-_REVCR_SEP2010.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b0798013-8fc8-4d1b-8ed7-6af117e7431c&Filename=311000-_311005-_311400-_311410-_REVCR_Letter_MAR2013.pdf
311000-_311005-_311400-_311410-_REVCR_Letter_MAR2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b0798013-8fc8-4d1b-8ed7-6af117e7431c&Filename=311000-_311005-_311400-_311410-_REVCR_Letter_MAR2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=eaf0fcd2-5cd1-42f7-9750-bc8904b35eae&Filename=311400-_CR_SEP1995.pdf
311400-_CR_SEP1995.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=eaf0fcd2-5cd1-42f7-9750-bc8904b35eae&Filename=311400-_CR_SEP1995.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f5b3ed1f-129c-4edf-9120-2195081802d3&Filename=311400-_L D_SEP2010.pdf
311400-_L&D_SEP2010.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=f5b3ed1f-129c-4edf-9120-2195081802d3&Filename=311400-_L D_SEP2010.pdf