project_id
0016130
SR 18 @ OCMULGEE RIVER 13 MI E OF FORSYTH
Project ID:
0016130
Notice to Proceed Date:
Project Manager:
Sheimicka Freeman
Construction Percent Complete:
%
Office:
Program Delivery
Current Completion Date:
County:
Jones, Monroe
Work Completion Date:
Congressional District:
008
Construction Contract Amount:
State Senate District.:
018, 025
Construction Contractor:
State House District:
144
Preconstruction Status Report
Project Type:
Replacement
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0016130
Project Description:
Bridge Replacement of SR 18 at Ocmulgee River. This structurally deficient bridge requires replacement due to deck condition including scaling, delamination and minor spalling with some steel exposed. Abutment one has settled and undermined the cap, while Abutment nine has erosion that has exposed two steel piles with moderate rust and corrosion.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2019
$1,445,000.00
ROW (Right of Way)
2026
$160,000.00
1/21/2025
UTL (Utilities)
2028
$94,284.49
4/19/2024
CST (Construction)
2028
$9,341,494.53
4/19/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=68f59e40-e539-479a-857e-018473d522b6&Filename=0016129_0016130_CR_MAR2022.pdf
0016129_0016130_CR_MAR2022.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=68f59e40-e539-479a-857e-018473d522b6&Filename=0016129_0016130_CR_MAR2022.pdf