15TH STREET EXTENSION FROM SR 9 TO CS 673/WILLIAMS STREET
Project ID: 0015019 Notice to Proceed Date:
Project Manager: Eka Okonmkpaeto Construction Percent Complete: 0.00%
Office: Program Delivery Current Completion Date:
County: Fulton Work Completion Date:
Congressional District: 005 Construction Contract Amount:
State Senate District.: 039 Construction Contractor: CITY OF ATLANTA
State House District: 057 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The project is a multi-modal connection that extends 15th Street from its current end point at West Peachtree two blocks west to Williams Street. The entire extension will be implemented on GDOT right-of-way eliminating the need for costly and time consuming land acquisition. The project is designed as a three lane section between West Peachtree Street and Spring Street with one through lane, a dedicated turn lane at Spring Street and a shared left/through lane and a dedicated turn lane at West Peachtree Street. There is a single through lane in each direction between Spring Street and Williams Street. Travel lanes are planned to be 11-feet wide. New traffic signals are required at 15th and Spring Street and at Williams Street. The corridor will have 10-foot sidewalks with a 5-foot furniture zone with trees and street lights, and striped 5-foot wide bike lanes providing a direct connection to the Arts Center MARTA station.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2016$316,947.00 
ROW (Right of Way)2021$509,000.0011/21/2019
CST (Construction)2022$7,021,195.706/22/2020