Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0013815
SR 16 @ ROCKY COMFORT CREEK 2.5 MI SW OF WARRENTON
Project ID:
0013815
Notice to Proceed Date:
Project Manager:
Recheal Mcmullin
Construction Percent Complete:
98.54%
Office:
Program Delivery
Current Completion Date:
County:
Warren
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
023
Construction Contractor:
GREGORY BRIDGE COMPANY
State House District:
128
Preconstruction Status Report
Project Type:
Replacement
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
0013815
Project Description:
Replacement of SR 16 Bridge over Rocky Comfort in Warren County (located 2.5 miles SW of Warrenton: The proposed project will replace the existing S.R. 16 bridge over Rocky Comfort Creek, which currently has a substandard sufficiency rating of 49.1. The length of the proposed bridge replacement and associated roadway improvements is approximately 3000-ft. A new alignment will be constructed adjacent to the existing alignment, offset to the southeast of the current S.R. 16 bridge. The project termini are 1500-ft north and 1500-ft south. The project is located approximately 2.5 miles southwest of Warrenton, Georgia. The proposed concrete bridge over Rocky Comfort Creek will be an approximately 140-ft long by 43.25-ft wide, concrete deck on prestressed concrete beams bridge. The typical section would include two 12-ft travel lanes with 8-ft shoulders for a 40-ft total clear width.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2016
$1,315,000.00
ROW (Right of Way)
2020
$93,706.34
5/15/2019
CST (Construction)
2020
$3,732,045.61
4/25/2019
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4a5eab2d-b1d6-44f2-bd0c-197ac8ddde2a&Filename=0013815_L D_JUN2019.pdf
0013815_L&D_JUN2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=4a5eab2d-b1d6-44f2-bd0c-197ac8ddde2a&Filename=0013815_L D_JUN2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ddf835dd-e843-4b35-bf28-31d8a413da09&Filename=0013815_L D_AD_AUG2019.pdf
0013815_L&D_AD_AUG2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ddf835dd-e843-4b35-bf28-31d8a413da09&Filename=0013815_L D_AD_AUG2019.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=deeed793-30b0-4a36-890f-dd1d6e5b88e0&Filename=0013815_CR_OCT2017.pdf
0013815_CR_OCT2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=deeed793-30b0-4a36-890f-dd1d6e5b88e0&Filename=0013815_CR_OCT2017.pdf