CR 723/FOREST HILL RD FROM SR 19 TO CR 5277/WOOD FOREST PL
Project ID: 0013676 Notice to Proceed Date:
Project Manager: Michael Vincent Hamilton Construction Percent Complete: %
Office: Program Delivery Current Completion Date:
County: Bibb Work Completion Date:
Congressional District: 008 Construction Contract Amount:
State Senate District.: 018 Construction Contractor:
State House District: 141, 143 Preconstruction Status Report
Project Type: Reconstruction/Rehabilitation Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
Forest Hill Road is an urban minor arterial that provides critical north-south mobility in northwest Macon. This roadway provides connectivity between US 41/SR 19 (Vineville Ave) to the south and Northside Drive, Riverside Drive, and I-75 to the north. The proposed project would widen Forest Hill Road to a three-lane section including curb and gutter, a multi-use path, and ADA compliant sidewalks and ramps. The project is needed to improve vehicular safety and operational efficiency as well as provide much needed pedestrian and bicycle facilities in this residential corridor. The three-lane section would improve traffic operations and match the recently completed 3-lane section along Forest Hill Road north of Wimbish Road. Currently, this corridor is lacking sidewalk connectivity, uniformity, and ADA access as well as adequate crosswalks.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2017$84,000.00 
PE (Preliminary Engineering)2018$0.00 
ROW (Right of Way)2028$3,560,000.0012/23/2020
UTL (Utilities)2029$1,843,300.006/28/2022
CST (Construction)2029$6,747,992.992/2/2022
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports