SR 13 FM CS 8/AFTON LANE TO CS 750/SHALLOWFORD TERRACE-PH II
Project ID: 0009400 Notice to Proceed Date:
Project Manager: Jeremy Busby Construction Percent Complete: 41.84%
Office: Program Delivery Current Completion Date:
County: DeKalb Work Completion Date:
Congressional District: 005, 006 Construction Contract Amount:
State Senate District.: 040, 042 Construction Contractor: E. R. SNELL CONTRACTOR, INC.
State House District: 081, 083 Preconstruction Status Report
Project Type: Safety Construction Status Report
Project Status: Under Construction More Information...
Right of Way Authorization: Contact Us
Project Description:
The improvements to occur along the corridor include: upgrading existing or adding new sidewalk and retrofitting the existing driveway aprons, adding a raised median from Afton Lane to Clairmont Terrace and adding pedestrian refuge islands, upgrading handicap ramps to meet ADA standards, and adding pedestrian lighting. In areas where sidewalk doesn't currently exist or is in bad condition, 5' sidewalks will be constructed. A 2' stamped concrete strip will be added between the curb and sidewalk where possible to move pedestrians further away from the traveled way. Header curb or curb and gutter will be replaced where necessary throughout the project. Existing drainage structures will be retained or raised wherever possible throughout the corridor.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2014$2,364,240.556/1/2009
ROW (Right of Way)2018$15,190,000.00 
CST (Construction)2022$33,544,874.856/15/2020