Home
Board
Employment
Blog
News
Contact Us
Project Information
Welcome to The GDOT
applications
GeoPI
Project Information
It looks like your browser does not have JavaScript enabled. Please turn on JavaScript and try again.
Welcome to The GDOT
Currently selected
Recent
project_id
0008256
I-75/I-575 MANAGED LANES IN COBB & CHEROKEE
Project ID:
0008256
Notice to Proceed Date:
Project Manager:
Stephen Jackson Lively
Construction Percent Complete:
%
Office:
Innovative Prog. Delivery
Current Completion Date:
County:
Cherokee, Cobb
Work Completion Date:
Congressional District:
011
Construction Contract Amount:
State Senate District.:
006, 014, 021, 032, 033, 037
Construction Contractor:
State House District:
020, 021, 034, 035, 037, 042, 043, 044, 046
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
0008256
Project Description:
This project begins on I-75 where the current HOV system ends at Akers Mill Road. It will be two bi-directional lanes, one lane in each direction, from Akers Mill to I-285. At I-285, the project will construct two reversible managed lanes on west side of I-75 between I-285 and I-575, adjacent to the southbound lanes. Near the I-575 interchange the managed lanes will move to the median. One lane will continue north on I-75 to north of Hickory Groove Road. One lane will continue north on I-575 to Sixes Road. System will be barrier separated and access points on I-75 will be provided which will not interfere with general purpose interchange operation. I-575 will have slip ramps to or from GP lanes. The operation of the manage lanes will be tolled to improve effectiveness. Access points on I-75 will be provided at I-285, Terrell Mill, Roswell Road, I-575, Big Shanty and Hickory Grove. The project length is 16.8 miles on I-75, 11.3 miles on I-575 and 1.6 miles on I-285.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2006
$38,500,000.00
5/1/2006
PE (Preliminary Engineering)
2007
$11,502,719.88
5/1/2006
PE (Preliminary Engineering)
2012
$35,000,000.00
5/1/2006
ROW (Right of Way)
2013
$26,186,795.68
3/19/2013
PE (Preliminary Engineering)
2013
$502,517.31
5/1/2006
SRTA (SRTA)
2014
$13,751,750.90
CST (Construction)
2014
$659,863,386.00
4/3/2014
CST (Construction)
2015
$66,000,000.00
4/3/2014
CST (Construction)
2016
$50,000,000.00
4/3/2014
CST (Construction)
2017
$31,292,307.74
4/3/2014
CST (Construction)
2018
$24,860,336.25
4/3/2014
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=284f23c2-9a79-4494-8692-e14b6290e413&Filename=0008256_L D_JUN2013.pdf
0008256_L&D_JUN2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=284f23c2-9a79-4494-8692-e14b6290e413&Filename=0008256_L D_JUN2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=98458ec5-bea7-49bc-9ac8-db6e5237c98a&Filename=0008256_CR_SEP2011.pdf
0008256_CR_SEP2011.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=98458ec5-bea7-49bc-9ac8-db6e5237c98a&Filename=0008256_CR_SEP2011.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=fa32870c-925d-477a-ade9-93ba46854270&Filename=0008256_L D_AD_JUN2013.pdf
0008256_L&D_AD_JUN2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=fa32870c-925d-477a-ade9-93ba46854270&Filename=0008256_L D_AD_JUN2013.pdf