Currently selected
Recent
project_id
0007842
I-85 @ SR 138 & SR 138 FM GOODSON CONN TO BUFFINGTON RD-DDI
Project ID:
0007842
Notice to Proceed Date:
Project Manager:
Adolfo Villarroel
Construction Percent Complete:
0.00%
Office:
Program Delivery
Current Completion Date:
County:
Fulton
Work Completion Date:
Congressional District:
006
Construction Contract Amount:
State Senate District.:
038
Construction Contractor:
State House District:
067, 068
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0007842
Project Description:
The proposed project is approximately 1.79 miles along SR 138 Jonesboro Road from Goodson Connector to Buffington Road. The project includes the modification of the SR 138 and I-85 interchange to a diverging diamond interchange. The northbound entrance ramp to I-85 and the southbound exit ramp to Jonesboro Rd/ SR 138 will be lengthened to improve capacity and merging operations. Jonesboro Rd/ SR 138 will add a shared through and right turn lanes from Goodson Connector to Lester Road, providing 3 lanes in each direction. The project will also interconnect and upgrade the signals along SR 138 from Goodson Connector on the west to Buffington Road to the east of the interchange. Landscaping and pedestrian lighting will be improved along Jonesboro Rd/SR 138. The entire project is located in Fulton County and within the city limits of Union City.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2014
$3,154,628.82
10/19/2018
PE (Preliminary Engineering)
2019
$1,793,549.84
10/19/2018
ROW (Right of Way)
2021
$14,240,000.00
2/23/2026
PE (Preliminary Engineering)
2021
$1,000,000.00
10/19/2018
UTL (Utilities)
2028
$2,492,600.00
2/23/2026
CST (Construction)
2028
$62,597,286.59
2/23/2026
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=63844ce3-62c9-4e76-ae05-4f835ecfe353&Filename=0007842_L D_MAY2021.pdf
0007842_L&D_MAY2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=63844ce3-62c9-4e76-ae05-4f835ecfe353&Filename=0007842_L D_MAY2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8a57c587-0c84-4e54-9ddc-810132edbb62&Filename=0007842_CR_JUN2017.pdf
0007842_CR_JUN2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=8a57c587-0c84-4e54-9ddc-810132edbb62&Filename=0007842_CR_JUN2017.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=9ac0fb45-8599-4b71-9602-f741ad41d982&Filename=0007842_L D_AD_JUN2021.pdf
0007842_L&D_AD_JUN2021.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=9ac0fb45-8599-4b71-9602-f741ad41d982&Filename=0007842_L D_AD_JUN2021.pdf
Project Outreach Archive
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/0007842_PIOH_Handout_signed_2017.03.09.pdf
0007842_PIOH_Handout_signed_2017.03.09.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/0007842_PIOH_Handout_signed_2017.03.09.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/TYTPICALS.pdf
TYTPICALS.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/TYTPICALS.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/Concept-0007842HLT-ALT-1-pr3.pdf
Concept-0007842HLT-ALT-1-pr3.pdf
https://mydocs.dot.ga.gov/PublicOutreach/0007842/PDF/Concept-0007842HLT-ALT-1-pr3.pdf