project_id
0006700
EFFINGHAM PKWY FM CR 156/BLUE JAY/EFFINGHAM TO SR 30/CHATHAM
Project ID:
0006700
Notice to Proceed Date:
Project Manager:
Cassius Octavius Edwards
Construction Percent Complete:
44.53%
Office:
Program Delivery
Current Completion Date:
County:
Chatham, Effingham
Work Completion Date:
Congressional District:
001
Construction Contract Amount:
State Senate District.:
002, 004
Construction Contractor:
BALFOUR BEATTY INFRASTRUCTURE, INC.
State House District:
161
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0006700
Project Description:
The proposed project would consist of constructing a two-lane new location roadway. The project would begin at SR 30 approximately 1.5 miles west of SR 21 and end at Blue Jay Road, approximately 3.2 miles west of SR 21. The intersection of Effingham Parkway at Blue Jay Road would be realigned to have Effingham Parkway tie into the east side of Blue Jay Road and the west side of Blue Jay Road would form a T-intersection with Effingham Parkway. The typical section is proposed to have 12-foot lanes with 10-foot outside shoulders (including 6.5-foot paved) on an 80-foot right-of-way. Right-turn and left-turn lanes would be provided at the intersections of SR 30, Goshen Road, Walter Tuten Road and Blue Jay Road. The total length of the project is approximately 6.4 miles.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2005
$2,997,079.75
10/22/2018
ROW (Right of Way)
2017
$3,610,000.00
9/16/2016
PE (Preliminary Engineering)
2019
$327,000.00
10/22/2018
CST (Construction)
2022
$58,695,945.45
9/8/2020
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7c98ec1d-38b5-430f-a08f-8e552a4205b4&Filename=0006700_CR_NOV2014.pdf
0006700_CR_NOV2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=7c98ec1d-38b5-430f-a08f-8e552a4205b4&Filename=0006700_CR_NOV2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=94af0b76-b45b-4221-af22-caadc55cf0c5&Filename=0006700_L D_NOV2018.pdf
0006700_L&D_NOV2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=94af0b76-b45b-4221-af22-caadc55cf0c5&Filename=0006700_L D_NOV2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b5efa25c-4e89-4da1-a69e-c68686298a80&Filename=0006700_L D_Ad_DEC2018.pdf
0006700_L&D_Ad_DEC2018.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=b5efa25c-4e89-4da1-a69e-c68686298a80&Filename=0006700_L D_Ad_DEC2018.pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/0006700/PDF/Effingham%20Pkwy%20Concept%20Display_2015.03.18.pdf
Effingham Pkwy Concept Display_2015.03.18.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0006700/PDF/Effingham%20Pkwy%20Concept%20Display_2015.03.18.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0006700/PDF/0006700_NEPA_PIOH%20Materials_2015.03.18.pdf
0006700_NEPA_PIOH Materials_2015.03.18.pdf
http://mydocs.dot.ga.gov/PublicOutreach/0006700/PDF/0006700_NEPA_PIOH%20Materials_2015.03.18.pdf