Currently selected
Recent
project_id
0000411
SR 83 CONN FROM SR 11 TO SR 83
Project ID:
0000411
Notice to Proceed Date:
Project Manager:
Bobby Gabriel Johnson
Construction Percent Complete:
95.22%
Office:
Program Delivery
Current Completion Date:
County:
Walton
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
017, 046
Construction Contractor:
E. R. SNELL CONTRACTOR, INC.
State House District:
112
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Under Construction
More Information...
Right of Way Authorization:
Contact Us
project_id
0000411
Project Description:
This project is to construct a new location, 4.7-mile connector that would provide a bypass around the historic downtown City of Monroe. The connector would tie into the existing intersection of James Huff Road and SR 10/US 78. The proposed typical section along the SR 83 Connector would consist of two 12-foot lanes (one travel lane in each direction) with 10-foot outside shoulders (6.5 feet paved). At intersection locations, single 12-foot right and left-turn lanes would be provided. The existing segment of SR 83 would remain as a two-lane roadway for approximately 0.73 miles from SR 83 at SR 83 Connector and would remain as a four-lane roadway with 12-foot travel lanes with a combination of a raised and depressed median for approximately 0.48 miles leading to SR 83 at SR 10/US 78.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
$110,000.00
7/19/2019
PE (Preliminary Engineering)
2003
$55,000.00
7/19/2019
PE (Preliminary Engineering)
2014
$50,000.00
7/19/2019
PE (Preliminary Engineering)
2016
$1,184,000.00
7/19/2019
PE (Preliminary Engineering)
2019
$590,000.00
7/19/2019
ROW (Right of Way)
2020
$11,170,000.00
4/25/2019
PE (Preliminary Engineering)
2020
$2,730,175.85
7/19/2019
CST (Construction)
2022
$34,396,742.06
3/4/2021
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=00311648-8e85-420c-90f9-ade8d1060c07&Filename=0000411_L D_MAY2020.pdf
0000411_L&D_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=00311648-8e85-420c-90f9-ade8d1060c07&Filename=0000411_L D_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=0dd8b90c-9d05-443a-b14a-f8fae75eba26&Filename=0000411_CR_JAN2013.pdf
0000411_CR_JAN2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=0dd8b90c-9d05-443a-b14a-f8fae75eba26&Filename=0000411_CR_JAN2013.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=82a8c0e8-468b-44fd-a75c-a723d59ddbe1&Filename=0000411_L D_Ad_MAY2020.pdf
0000411_L&D_Ad_MAY2020.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=82a8c0e8-468b-44fd-a75c-a723d59ddbe1&Filename=0000411_L D_Ad_MAY2020.pdf