project_id
713210-
I-75 NB CD SYSTEM FROM SR 331 TO I-285
Project ID:
713210-
Notice to Proceed Date:
Project Manager:
Ashley M. Willoughby
Construction Percent Complete:
99.02%
Office:
Program Delivery
Current Completion Date:
County:
Clayton
Work Completion Date:
Congressional District:
005
Construction Contract Amount:
State Senate District.:
034
Construction Contractor:
ARCHER WESTERN CONSTRUCTION, LLC
State House District:
060, 074
Preconstruction Status Report
Project Type:
Reconstruction/Rehabilitation
Construction Status Report
Project Status:
Complete
More Information...
Right of Way Authorization:
Contact Us
project_id
713210-
Project Description:
This project proposes to develop a C-D roadway adjacent to northbound I-75 that would service the I-75 at I-285 interchange. The proposed project would begin along I-75 at Forest Parkway Interchange and extend approximately 2.0 miles to I-75 at I-285 Interchange. Multiple improvements are also included under this proposed project. These improvements include reconfiguration of the Forest Parkway at I-75 Interchange ramps and the I-285 at I-75 Interchange ramps, operational improvements to the I-75 corridor between Forest Parkway and I-285, and reconfiguration of the Frontage Road along the east side of I-75. In summary, approximately 3.26 miles of interchange ramp modifications and new collector-distributor adjacent to northbound I-75 connecting to Forest Parkway and I-285 in Clayton County.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
1995
$1,717,497.02
4/9/2013
PE (Preliminary Engineering)
2014
$1,796,209.13
4/9/2013
ROW (Right of Way)
2016
$4,202,400.00
12/4/2015
CST (Construction)
2019
$81,558,258.04
10/10/2018
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=12ec319d-61a2-4fe5-9d22-d358c0707aba&Filename=713210_CR_AUG2014.pdf
713210_CR_AUG2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=12ec319d-61a2-4fe5-9d22-d358c0707aba&Filename=713210_CR_AUG2014.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=5c16a99b-1090-495d-930e-bb8fba6645cc&Filename=713210-_L D_AD_MAR2016.pdf
713210-_L&D_AD_MAR2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=5c16a99b-1090-495d-930e-bb8fba6645cc&Filename=713210-_L D_AD_MAR2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=6ea8cc47-fe2f-451d-ba33-5c3e48e19bcd&Filename=713210-_L D_FEB2016.pdf
713210-_L&D_FEB2016.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=6ea8cc47-fe2f-451d-ba33-5c3e48e19bcd&Filename=713210-_L D_FEB2016.pdf
Project Outreach Archive
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/0713210_Layout.pdf
0713210_Layout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/0713210_Layout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/713210_PIOHHandout_25Jun15.pdf
713210_PIOHHandout_25Jun15.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/713210_PIOHHandout_25Jun15.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/713210_PIOH%20Handout.pdf
713210_PIOH Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/PDF/713210_PIOH%20Handout.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/JPG/713210_PIOH%20Display.pdf
713210_PIOH Display.pdf
http://mydocs.dot.ga.gov/PublicOutreach/713210-/JPG/713210_PIOH%20Display.pdf