Bibb-Jones Cross County Connector Study

The final report for the Bibb-Jones Cross County Connector Study was completed in January 2005.

The Bibb Jones Cross County Connector Study was divided into two phases.  Phase I, completed in April 2004, collected data and identified a need for a new location roadway connecting I-75 in Bibb/Monroe County to US 80 in east Bibb County.  Phase II, completed in December 2004, identified several potential alignments and identified a preferred planning corridor on which the Cross County Connector could be constructed.  Based on costs, social impacts, environmental impacts, public comments and serving the needs of the traveling public, the preferred planning corridor was presented to the public on November 16, 2004 at a Public Information Meeting held at the Jones County High School in Gray, Georgia.

If you have questions, please send an e-mail to Lesa Walker, GDOT Project Manager at lwalker@dot.ga.gov.

Related Documents and Files

Final Report

The final report on the Bibb Jones Cross County Connector Study was completed in January 2005.  It is available in .pdf format (file size = approximately 8 meg).

  • Phase 1 Report
  • Phase 1 Report (.pdf)
  • 1998 EJ Deficiencies
  • 1998 V/C ratios
  • 1998 V/C ratios for Downtown inset
  • 2030 "Existing + Committed (E+C)" V/C ratios
  • 2030 "Existing + Committed (E+C)" V/C ratios for Downtown inset
  • 2030 Long Range Transportation Plan (LRTP) V/C ratios
  • 2030 Long Range Transportation Plan (LRTP) V/C ratios for Downtown inset
  • 2001 Bibb County traffic count data
  • 2001 Bibb County Crash data
  • 2001 Jones County traffic count data
  • 2001 Jones County Crash data
  • 2001 Monroe County traffic count data
  • 2000 Minority Population data
  • 2000 Population below poverty level

 