SR 8/SR 316 @ CR 329/BARBER CREEK ROAD
Project ID: 0013910 Notice to Proceed Date:
Project Manager: Achor Njoku Construction Percent Complete: %
Office: Alternative Delivery Current Completion Date:
County: Barrow Work Completion Date:
Congressional District: 010 Construction Contract Amount:
State Senate District.: 047 Construction Contractor:
State House District: 119 Preconstruction Status Report
Project Type: New Construction Construction Status Report
Project Status: Construction Work Program More Information...
Right of Way Authorization: Contact Us
Project Description:
The proposed project will remove the existing at-grade crossings at Barber Creek Road and Craft Road with US 29/SR 8/SR 316 at both intersections and a create a grade separated diamond interchange at Barber Creek Road. A bridge over SR 316 is proposed along Barber Creek Road. Craft Road is proposed as a cul-de-sac on the south side of SR 316 and a new frontage road is proposed to connect the northern portion of Craft Road to Barber Creek Road. To the north, Ventura Street will be realigned to form an intersection with Barber Creek Road. Wylie McGuire Road, located south of SR 316, will be realigned to connect with Barber Creek Road at a location further south than the current intersection.
ActivityProgram YearCost EstimateDate of Last Estimate
PE (Preliminary Engineering)2020$1,500,000.006/28/2022
ROW (Right of Way)2022$490,000.00 
PE (Preliminary Engineering)2022$4,517,416.006/28/2022
ROW (Right of Way)2023$5,210,000.00 
PE (Preliminary Engineering)2023$541,216.086/28/2022
ROW (Right of Way)2024$1,320,000.00 
CST (Construction)2024$12,342,045.002/9/2024
CST (Construction)2025$36,642,313.002/9/2024
CST (Construction)2026$29,064,053.002/9/2024
CST (Construction)2027$10,984,420.002/9/2024
Project Search (TransPI) Map
 Project Documents

Approved Concept Reports