SR 8/SR 316 @ CR 329/BARBER CREEK ROAD
Project ID:
0013910
Notice to Proceed Date:
Project Manager:
Achor Njoku
Construction Percent Complete:
%
Office:
Alternative Delivery
Current Completion Date:
County:
Barrow
Work Completion Date:
Congressional District:
010
Construction Contract Amount:
State Senate District.:
047
Construction Contractor:
State House District:
119
Preconstruction Status Report
Project Type:
New Construction
Construction Status Report
Project Status:
Construction Work Program
More Information...
Right of Way Authorization:
Contact Us
project_id
0013910
Project Description:
The proposed project will remove the existing at-grade crossings at Barber Creek Road and Craft Road with US 29/SR 8/SR 316 at both intersections and a create a grade separated diamond interchange at Barber Creek Road. A bridge over SR 316 is proposed along Barber Creek Road. Craft Road is proposed as a cul-de-sac on the south side of SR 316 and a new frontage road is proposed to connect the northern portion of Craft Road to Barber Creek Road. To the north, Ventura Street will be realigned to form an intersection with Barber Creek Road. Wylie McGuire Road, located south of SR 316, will be realigned to connect with Barber Creek Road at a location further south than the current intersection.
Activity
Program Year
Cost Estimate
Date of Last Estimate
PE (Preliminary Engineering)
2020
$1,500,000.00
6/28/2022
ROW (Right of Way)
2022
$490,000.00
PE (Preliminary Engineering)
2022
$4,517,416.00
6/28/2022
ROW (Right of Way)
2023
$5,210,000.00
PE (Preliminary Engineering)
2023
$541,216.08
6/28/2022
ROW (Right of Way)
2024
$1,320,000.00
CST (Construction)
2024
$12,342,045.00
2/9/2024
CST (Construction)
2025
$36,642,313.00
2/9/2024
CST (Construction)
2026
$29,064,053.00
2/9/2024
CST (Construction)
2027
$10,984,420.00
2/9/2024
Project Search (TransPI) Map
Project Documents
FILE_PATH
FILE_NAME
PATH
Approved Concept Reports
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=79768d18-87af-4ea4-9165-36ffa4add385&Filename=0010352_0013910_L D_FEB2024.pdf
0010352_0013910_L&D_FEB2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=79768d18-87af-4ea4-9165-36ffa4add385&Filename=0010352_0013910_L D_FEB2024.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ecb2d24b-fdf9-4fdd-87ea-bb2ea723da9b&Filename=0010352_0013910_CR_MAR2023.pdf
0010352_0013910_CR_MAR2023.pdf
https://www.dot.ga.gov/_layouts/GDOT.SharePoint.CustomHttpHandlers/PWDocumentDownloadHandler.ashx?DocGUID=ecb2d24b-fdf9-4fdd-87ea-bb2ea723da9b&Filename=0010352_0013910_CR_MAR2023.pdf